A technology for pavement repair and subgrade, which is applied in the direction of roads, roads, and pavement details, etc. It can solve the problems that affect the road surface condition, road driving comfort, low joint strength, and secondary damage, so as to improve traffic comfort and waterproof. Improvement of permeability and strength, compression resistance and durability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example 1-3
[0045] With reference to the proportioning of table 1, make primer by the following method:
[0046] Slowly add the epoxy resin into the solvent under stirring, and continue stirring for 15 minutes after the addition to mix evenly. Then, under stirring, add the rheology aid and thickening agent in turn, and continue stirring for 20 minutes to completely mix well; take half of the original formula. Water is added to the aforementioned mixture, and the A component is obtained after stirring and mixing evenly;
[0047] Add the curing agent to the remaining half of the water and stir and mix evenly to prepare component B;
[0048] Before the primer is applied, add the B component to the A component and stir and mix evenly to prepare the primer.
[0049] Wherein, the curing agent is an aromatic amine curing agent; the solvent is dipropylene glycol methyl ether.
[0050] Table 1: Distribution ratio (%) of each component in Preparation Examples 1-3
[0051] water epo...
Embodiment 1
[0055] A pavement repair structure, refer to figure 1 , repair the pavement according to the following methods:
[0056] S1. Clean up the debris and accumulated water at the damaged position of the road surface, shovel off the excess asphalt concrete at the damaged position to expose the lower subgrade, cut the stubble of the original asphalt concrete pavement at the edge of the damaged position neatly, and then put concrete on the original asphalt pavement at the edge of the damaged position. The height of 3cm is removed by grinding down the layer to form a repair step, and the width of the repair step in the horizontal direction is 5cm;
[0057] S2. Evenly spray the primer prepared in Preparation Example 1 on the cleaned roadbed, control the coating thickness to be 2 mm, and then use 70°C air blowing to heat and cure to obtain the bottom layer 2;
[0058] S3. Pour the asphalt concrete on the surface of the bottom layer 2, and spread it to extend to the repair step, flatten ...
Embodiment 2
[0061] A pavement repair structure, the difference from Example 1 is that the primer is the primer prepared in Preparation Example 2, and the rest are consistent with Example 1.
PUM
| Property | Measurement | Unit |
|---|---|---|