Thermal power plant boiler pedestal and foundation connection structure and method thereof
A technology for connecting structures and thermal power plants, which is applied in infrastructure engineering, building construction, construction, etc., and can solve problems such as structural safety hazards and failure to meet bearing capacity requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0011] Embodiment 1. It includes a boiler steel column 1, a foundation insertion bar 2, and a steel column foundation 5. There is an insertion bar 2 in the foundation 5, and a steel embedded part 4 is arranged on the top of the foundation. The steel embedded part 4 is welded to the boiler steel column 1, The foundation rib 2 is welded to the boiler steel column 1.
Embodiment 2
[0012] Embodiment 2. In order to facilitate the welded connection between the boiler steel column 1 and the steel embedded parts 4 and better stress, on the basis of the above structure, a steel column foot plate 3 is added under the boiler steel column 1. The steel column foot plate 3 First weld with the boiler steel column 1, and then weld the steel column foot plate 3 with the embedded steel part 4.
Embodiment 3
[0013] Embodiment 3. In order to improve and enhance the stress situation and increase the strength of the boiler steel column 1, on the basis of the structure of the above-mentioned embodiment 1 or embodiment 2, add 4 steel column foot shoe plates 6 around the boiler steel column 1 , The steel column foot shoe plate 6 is welded and connected with the boiler steel column 1, the steel embedded part 4 or the steel column foot plate 3.
[0014] The method of the present invention is as follows: first pre-set the ribs 2 at the foundation position and then pour the foundation 5, pre-embed the embedded steel parts 4 in the foundation 5, weld the boiler steel column 1 and the embedded steel parts 4 of the foundation, and then insert the ribs 2 into the foundation. It is welded on the steel column 1, and finally the concrete short column on the upper part of the foundation 2 is poured. Foundation 1 is poured with C30 concrete. In the case of a structure such as embodiment two, the st...