Construction method for pre-burying electrical line into cast-in-situ seamless hollow floor slab
A technology of hollow floor slabs and construction methods, applied in the direction of electrical components, etc., to achieve good construction quality and ensure the effect of construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0022] figure 1 Shown is the process flow diagram of an embodiment of the construction method for the pre-embedded electromechanical pipeline in the cast-in-place beamless hollow floor. figure 2 --6 is a schematic diagram of the location and treatment of pipeline embedding under different conditions.
[0023] Such as figure 1 As shown, in this embodiment, the pre-embedded construction process of the electromechanical pipeline in the cast-in-place beamless hollow floor is as follows:
[0024] 1. Technical clarification: Before construction, the drawings will be reviewed, and the civil structure, the cast-in-place beamless hollow floor structure and the location of the pipeline embedded in the electromechanical system will be reviewed in detail, and the location, size, specification and quantity of the embedded pipeline will be determined , Material, e...