[0021] Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0022] figure 1 Shown is the process flow chart of an embodiment of the construction method for the pre-embedding of mechanical and electrical pipelines in the cast-in-place beamless hollow floor slab, figure 2 --6 are schematic diagrams of the pre-embedded position and treatment of pipelines under different circumstances.
[0023] Such as figure 1 As shown, in this embodiment, the pre-embedded construction process of electromechanical pipelines in the cast-in-place beamless hollow slab is as follows:
[0024] 1. Technical clarification: conduct a joint review of drawings before the start of construction, conduct a detailed review of the civil engineering structure, the civil engineering cast-in-place beamless hollow floor structure and the pre-embedded position of the mechanical and electrical system pipelines, and determine the position, size, speci...