Construction process for reclamation by hydraulic filling of silt and device thereof
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- 武汉华荣科技发展有限责任公司
- Publication Date
- 2010-09-08
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a construction technique and a device for land reclamation by dredging and filling silt, and belongs to the technical field of civil engineering foundation treatment. Background technique
[0002] In recent years, my country's coastal areas, such as the Bohai Bay area, the Yangtze River Delta, the Pearl River Delta area, and the Beibu Gulf area, are rapidly promoting land reclamation projects. Since 2005, the area of land reclamation in China's coastal areas has been more than 100 square kilometers every year. In 2009, the area of land reclamation reached 150 square kilometers. At present, most of the land reclamation projects in our country adopt the land reclamation method of dredging and filling silt, that is, blowing and filling the seabed silt into the enclosure, and turning the silt into a foundation with a certain bearing capacity after certain treatment.
[0003] At present, the main method to deal with these dredgi...