Performance tester for gel valve in the course of underbalance well drilling and well completion and application thereof
An underbalanced drilling and tester technology, applied in the field of oil and gas field drilling, can solve problems such as failure to perform accurate evaluations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] This example evaluates the jelly strength of the jelly valve at 90°C.
[0030] (1) Close the pressure reducing valve 2, the flow meter 3, the lower pressure valve 6, install the bottom cover 15, put the temperature control probe 12 into the temperature control rubber tube 8, and preheat the instrument to 90°C;
[0031] (2) Put the gasket into the temperature-controlled rubber tube body 8 and spread it flat on the pressure hole at the lower end, then pour the prepared solution to be glued, install the top cover 13, and heat for 5 hours;
[0032] (3) Before testing, turn off the temperature controller 5, pull out the temperature control probe 12, and remove the top cover 13;
[0033] (4) Open the lower pressure valve 6 (note that the flowmeter is closed at this time, because the pressure of the large pipe is large, the liquid is easy to flow back, so the lower pressure valve cannot be opened too large), then open the pressure reducing valve 2, when the temperature is controlled W...
Embodiment 2
[0037] This example evaluates the jelly strength of the jelly valve at 120°C.
[0038] (1) Close the pressure reducing valve 2, the flow meter 3, the lower pressure valve 6, install the bottom cover 15, put the temperature control probe 12 into the temperature control rubber tube body 8, and preheat the instrument to 120°C;
[0039] (2) Put the gasket into the temperature-controlled rubber tube body 8, make it flat on the pressure hole at the lower end, pour the configured solution to be glued into the temperature-controlled rubber tube body 8, install the top cover 13, in Heat at 120℃ for 5h;
[0040] (3) Before testing, turn off the temperature control instrument 5, pull out the temperature control probe 12; remove the top cover 13;
[0041] (4) Open the lower pressure valve 6 (note that the flowmeter is closed at this time, because the pressure of the large pipe is large, the liquid is easy to flow back, so the lower pressure valve cannot be opened too large), then open the pressur...
Embodiment 3
[0045] This example analyzes the air tightness strength of the jelly valve.
[0046] (1) Close the pressure reducing valve 2, the flow meter 3, the lower pressure valve 6, and install the bottom cover 15, put the temperature control probe 12 into the temperature control rubber tube body 8, and preheat the instrument to 80°C;
[0047] (2) Pour in the prepared solution to be glued, install the top cover 13, and heat for 5 hours;
[0048] (3) Before testing, turn off the temperature control instrument 5, pull out the temperature control probe 12; remove the top cover 13;
[0049] (4) Open the lower pressure valve 6 (note that the flowmeter is closed at this time, because the pressure of the large pipe is large, the liquid is easy to flow back, so the lower pressure valve cannot be opened too large), then open the pressure reducing valve 2, when the temperature is controlled When the size of the rubber tube body (8) is 2in outer diameter and 30cm high, the pressure does not exceed 0.02Mpa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



