Slope protection pile pouring and cable bolting construction method for deep foundation pit

A technology for deep foundation pit support and anchor cable support, which is applied in basic structure engineering, drilling equipment and methods, excavation, etc., can solve the problems of inconvenient construction process control, complex construction steps, large construction space, etc. The effect of simple quality control, convenient construction machinery and equipment, and low construction noise

Inactive Publication Date: 2011-04-27
SCEGC NO 6 CONSTR ENG GRP CO LTD
View PDF5 Cites 36 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a deep foundation pit perfusion slope protection pile plus anchor cable support construction method for the above-mentioned deficiencies in the prior art, which has reasonable design, simple construction steps, low investment cost and large support depth , The use effect is good, and it can solve the complex construction steps, high construction cost, inconvenient construction process control, easy to cause damage to the adjacent pipelines, roads and buildings on the surrounding side, and large construction space in the existing double-row pile support method. Practical problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Slope protection pile pouring and cable bolting construction method for deep foundation pit
  • Slope protection pile pouring and cable bolting construction method for deep foundation pit
  • Slope protection pile pouring and cable bolting construction method for deep foundation pit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0065] Such as figure 1 , figure 2 , image 3 , Figure 7 and Figure 8 Shown, deep foundation pit perfusion slope protection pile of the present invention adds anchor cable support construction method, comprises the following steps:

[0066] Step 1. Pre-construction preparation: According to the design excavation depth of the deep foundation pit to be constructed, combined with the geological conditions of the construction area and the distribution of buildings around the location of the deep foundation pit to be constructed, and adopt the deep foundation pit support The mechanical analysis and calculation method of the soil protection body first analyzes and obtains the number of pouring slope protection piles and anchor cable support systems that need to be constructed, and each pouring slope protection pile plus anchor cable support system is correspondingly arranged on a side wall of the deep foundation pit that needs to be constructed Above, the perfusion slope prot...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a slope protection pile pouring and cable bolting construction method for a deep foundation pit. The method comprises the following steps of: 1, making preparations before construction; 2, pouring a slope protection pile, namely measuring, paying off, molding and constructing the poured slope protection pile, punching holes on the poured slope protection pile, binding and hoisting a steel reinforcement cage for molding the slope protection pile, pouring concrete into the poured slope protection pile and constructing a crown beam at the top end of the pile; and 3, excavating a foundation in a layered form and constructing anchor ropes on different rows, namely excavating a first-layer foundation, arranging a first row of anchor ropes, arranging a steel waist rail, arranging anchor heads of the anchor ropes, tensioning the anchor ropes and finishing excavating processes of different layers of foundations and arranging different rows of anchor ropes. The method has a reasonable design, simple construction steps, low investment cost, large support depth and good using effect, and solves the problems of complicated construction steps, high construction cost, inconvenience in control, easy damage to surrounding pipelines, roads, buildings and the like, large construction space and the like existing in the conventional double-row pile supporting method can be solved.

Description

technical field [0001] The invention belongs to the technical field of deep foundation pit support construction, and in particular relates to a deep foundation pit perfusion slope protection pile plus anchor cable support construction method. Background technique [0002] With the rapid development of the construction industry, the construction of high-rise buildings and the utilization of underground space have stimulated the development of excavation and support technology for deep foundation pit engineering. Most of the newly built high-rise buildings have deep foundations and multi-storey basements, and the buried depth of the foundations has reached more than 15m, and there are many pipelines, roads and buildings near the foundation pits. In actual construction, in order to ensure the quality of the project and the safety of personnel and property, and to ensure that adjacent pipelines, roads and buildings are not damaged, higher requirements are put forward for the con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02E02D5/34E02D5/36E02D5/74E21B3/00E21B10/42
Inventor 石会荣赵长经张雪娥田定义丁新建陈权林樊月英张峰
Owner SCEGC NO 6 CONSTR ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products