Hydraulic drill follow-up pipe-shed construction method
A construction method and pipe shed technology, applied in earthwork drilling, shaft equipment, wellbore lining, etc., can solve problems such as no construction method, achieve convenient construction, prevent drilling tool deflection, and ensure the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0030] The utility model relates to a construction method for a rhinestone-tracking pipe shed. Two guide rails are laid on the work site perpendicular to the tunnel axis at the construction face, for the drilling rig platform to travel and the pipe shed positioning. During construction, the drilling rig platform is used outside the frame. From the tunnel entrance and exit at a certain interval, the mud wall is drilled with water drills to form a mud wall. While drilling, follow the pipe construction at the same time, and finally form advanced pre-support to improve the stiffness and bearing capacity of the stratum, and uniformly distribute the uneven normal distribution of the load. The purpose is to reduce the land subsidence during the subsequent frame excavation and ensure the safety of cultural relic sites.
[0031] Specifically include the following steps:
[0032] 1) Positioning
[0033] 1.1 Construction preparation: temporary construction, personnel, equipment, testin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com