Operation actual performance collecting system and energy menagement system
A technology for collecting systems and performance, applied in manufacturing computing systems, data processing applications, instruments, etc., to solve problems such as insufficient consideration of energy resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0069] figure 1 It is a configuration diagram showing the work performance collection system according to Embodiment 1 of the present invention. The work performance collection system S includes: a work terminal 10 installed in the test equipment area 50 (work area); a work performance management device 20 that collects work performance from the work terminal 10 and manages the work performance; a measuring device 30; and an instruction book issuing terminal 40. In addition, the work performance management device 20 collects the actual use results of the power supplied to the test equipment area 50 via the measuring device 30 . The work terminal 10, the work performance management device 20, the measuring device 30, and the instruction book issuing terminal 40 are connected by a network 90 such as a LAN (Local Area Network).
[0070] UPS inspection proving ground such as figure 1 As shown, there are a plurality of test equipment areas 50, and UPS60 (UPS1, UPS2, . and load ...
Embodiment approach 2
[0114] Figure 7 It is a configuration diagram showing a work record collection system according to Embodiment 2 of the present invention. Figure 7 The composition shown is in figure 1 The case where the load switch 31 is provided based on the shown structure. The ON / OFF command (on command / off command) of the load switch 31 is linked with the placement and removal of the IC tag reader / writer 15 on the instruction sheet 70 . This makes it possible to more precisely manage the consumption amount of the electric power which is the consumption rate information required for the product. Also, omit the figure 1 Description of the same section.
[0115] The IC tag reader / writer 15 reads the IC tag 71 attached to the instruction book 70 after confirming the communication with the IC tag 71 for job confirmation when the instruction book 70 is placed on the IC tag placement place 15a. The information transmits the communication start information with the IC tag 71 for work specif...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 