Method for controlling silicon content in low-silicon aluminum steel refining process
A low-silicon-aluminum and silicon-content technology, which is applied in the field of silicon content control in the low-silicon-aluminum steel refining process, can solve problems such as silicon increase, and achieve the effect of reducing the probability of stoppage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
specific Embodiment approach
[0021] Taking the refining steel wool line in the ladle refining furnace of No. 1 steelmaking branch factory of Wuhan Iron and Steel Co., Ltd. as an example, the specific implementation of the method for controlling the silicon content in the refining process of low-silicon aluminum steel is described, which includes the following steps:
[0022] 1) The molten steel in the ladle is initially slagged through the argon station, and then the ladle is hoisted into the ladle refining furnace.
[0023] 2) Measure the molten steel temperature as 1585°C, and determine the heating time as 15 minutes according to the measured actual molten steel temperature, the heating target value as 1630°C and the heating rate of 3°C / min, to ensure that the heating is in place at one time, and to the weight during the heating process. Add 175kg of lime and 85kg of refining slag to 115 tons of molten steel. At the same time, according to the color of the slag sample and the composition of the molten st...
Embodiment 2
[0027] This example is basically the same as Example 1, except that: 2) The measured molten steel temperature is 1558°C, and the heating time is determined to be 18 minutes according to the measured actual molten steel temperature, the heating target value, and the heating rate of 4°C / min, and Add 200kg of lime and 100kg of refining slag during the heating process.
[0028] 3) Soft blow for 4 minutes after heating, add 220kg of lime and 300kg of refining slag, and then ensure that the acid-soluble aluminum content does not exceed 330ppm after adding aluminum pellets.
[0029] 4) After 4 minutes of soft blowing, feed 700m of calcium iron wire, and ensure that the basicity of the final slag is controlled at 5.0, and the sum of FeO and MnO content is controlled at 1.3% of the total weight of slag.
Embodiment 3
[0031] This example is basically the same as Example 1, except that: 2) The measured molten steel temperature is 1535°C, and the heating time is determined to be 19 minutes according to the measured actual molten steel temperature, the heating target value, and the heating rate of 5°C / min, and Add 225kg of lime and 117kg of refining slag during the heating process.
[0032] 3) Soft blow for 5 minutes after heating, add 300kg of lime and 400kg of refining slag, and then ensure that the acid-soluble aluminum content does not exceed 400ppm after adding aluminum pellets.
[0033] 4) After 5 minutes of soft blowing, feed 800m of calcium iron wire, and ensure that the basicity of the final slag is controlled at 5.2, and the sum of FeO and MnO content is controlled at 1.5% of the total weight of slag.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com