Unlock instant, AI-driven research and patent intelligence for your innovation.
Preparation method of cement gum for intermediate frequency furnace
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
An intermediate frequency furnace and mortar technology is applied in the field of preparation of mortar for intermediate frequency furnaces. The effect of energy consumption
Inactive Publication Date: 2014-09-10
长兴泓矿炉料有限公司
View PDF3 Cites 11 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0002] At present, there are a large number of intermediate frequency furnaces used for smelting alloys and heating annealing in our country. Some of them use siliconcarbide as the lining or use a single resin combined with cement for the protection and insulation of intermediate frequency furnace coils. Easy to break, short service life, high frequency of replacement, inconvenient, high energy consumption, and insufficient protection for intermediate frequency furnace coils
Moreover, the labor intensity of workers is too high for each repair and maintenance, and it is easy to cause many unsafe factors in a high-heat environment.
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Examples
Experimental program
Comparison scheme
Effect test
preparation example Construction
[0017] The technical scheme of the present invention is: a kind of preparation method of cement for intermediate frequency furnace, comprises the following steps:
[0018] A. Evenly mix the raw materials consisting of dense brown corundum, dense brown corundumfine powder, binder, superfine powder, additives and anti-knocking agent;
[0019] B. Put the mixed raw materials into the forced mixer for stirring. After stirring evenly, add additives and stir evenly. When using, add a certain proportion of water and stir evenly. The evenly formed cement should be spread around the coil;
[0020] C. After construction, it should be dried naturally for 4 hours in order to complete the hydration reaction process. During partial renovation, it should be dried naturally for 1 hour to facilitate the full volatilization of water, ensure the inter-turn and overall insulation of the intermediate frequency furnace coil, and make it have the corresponding strength.
[0021] In the present inv...
Embodiment 1
[0026] Example 1: The mass percentages of dense brown corundum, dense brown corundum fine powder, binder, superfine powder, additives and explosion-proof agents in the cement are 70%, 10%, 8%, 2%, 2%, and 3% respectively. %, 5%.
Embodiment 2
[0027] Example 2: The mass percentages of dense brown corundum, dense brown corundum fine powder, binder, superfine powder, additives and explosion-proof agents in the cement are 73.4%, 20%, 5%, 0.5%, 0.5%, 0.5% respectively %, 0.1%.
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Property
Measurement
Unit
particle size
aaaaa
aaaaa
Login to View More
Abstract
The invention discloses a preparation method of cement gum for an intermediate frequency furnace. The preparation method comprises the following steps: first, uniformly mixing raw materials formed by compact brown aluminum oxide, compact brown aluminum oxidefine powder, a bonder, superfine powder, an additive and a detonation inhibitor; then, stirring the mixed raw materials and plastering the uniformly stirred cement gum around a coil; finally, after construction, naturally drying to complete hydration reaction to ensure the turn-to-turn and integral insulativity of the coil of the intermediate frequency furnace, wherein the coil has corresponding strength. The cement gum prepared by the method is long in furnace life, high in work efficiency, simple to maintain and suitable for a high-heat environment.
Description
technical field [0001] The invention relates to a preparation method of cement for an intermediate frequency furnace. Background technique [0002] At present, there are a large number of intermediate frequency furnaces used for smelting alloys and heating annealing in our country. Some of them use siliconcarbide as the lining or use a single resin combined with cement for the protection and insulation of intermediate frequency furnace coils. Easy to break, short service life, high replacement frequency, inconvenient, high energy consumption, and insufficient protection for intermediate frequency furnace coils. Moreover, the labor intensity of workers is too large when repairing and maintaining each time, and it is easy to cause many unsafe factors in a high-heat environment. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide a method for preparing the clay for intermediate frequency furnaces. The clay has a long ...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.