Door clear width aggregate of platform screen doors of long-rail train
A rail train and platform screen technology, applied in stations, tracks, roads, etc., can solve problems such as blocking small doors, hindering passengers from getting on and off, and having no overlapping doors
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0084] 34. The structure of the platform screen door of the rail train marshalling on the Changchao platform requires the principle of maximizing the total net width of the door. On the premise of ensuring the overall structure of the carriage is solid and safe, the total net width of the platform screen door is required to exceed the existing The total net width of platform screen closed doors; including: the total net width of platform screen closed doors exceeds the total net width of the side doors (single side doors) of existing subway trains and light rail trains, and the total original door net width is equal to or greater than the current total There is a principle of 7.5 meters for the subway door to maximize the total net width of the door; the total is equal to or about 7.5 meters, that is, the total net width of the doors (single-side doors) of the waiting compartment of the subway train and light rail train is more than 7.5 meters;
[0085] Change the platform scre...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


