Gravity slide type overpass
A slide and gravity technology, applied to bridges, bridge parts, escalators, etc., can solve the problem of single function of overpass, time-consuming and physical strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0015] Such as Figure 1-5 Shown, a kind of gravity slide type overpass, comprises bridge body 1, inclined track 2, stair 3, gravity slide 4, deceleration transmission system 9, described bridge body 1 is across the street, and stair 3 is set respectively at bridge body two ends, A guardrail 4 is provided on the outside of the bridge body, and an inclined track is installed along the outside of the stairs, and a transmission belt 6 is arranged on the inclined track;
[0016] The upper end of the inclined track 2 is a bearing platform 7, and the tail end is a buffer platform 8. The function of the buffer platform is to slow down the kinetic energy of sliding, reduce the instantaneous landing speed, and ensure safety.
[0017] A gravity slide 4 is respectively installed on the carrying platform 7 and the buffer platform, the gravity slide is arranged on the transmission belt 6, and is driven up and down in the inclined track by the transmission belt, and the described reduction ...
Embodiment 2
[0023] Such as Figure 6 Shown: on the bridge bearing platform, a pedestrian passage 23 is provided on the separation plate 10 between the stairs and the inclined slide rail. When the people who walk the stairs are tired, they can step into the gravity slide 4 on the carrying platform 7 from the stairs and slide down the bridge easily. When the gravity slide 4 on the buffer platform 8 is raised, the personnel on the carrying platform can also directly step into the stairs and go down on foot. When crossing the road, people can choose to cross the bridge by going up and down the stairs, or slide to the opposite road through the gravity slide 4. This facility provides multiple options for people crossing the bridge, saving time and effort.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 