Construction method of reinforced concrete current-poured pile
A technology of reinforced concrete and construction method, applied in sheet pile wall, foundation structure engineering, construction and other directions, can solve the problems of necking, low bearing capacity of pile body, etc. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. While the invention will be described in conjunction with the preferred embodiments, it will be understood that it is not intended to limit the invention to the described embodiments. On the contrary, the invention is to cover alternatives, modifications and equivalents, which may be included within the scope of the invention as defined by the appended claims.
[0038] refer to figure 1 As shown, the hole is formed using a drill and a disc former 14. First, use a drilling rig to drill holes with a diameter of 1250mm. After drilling to a depth of 20m to 25m, hang them into the support plate forming machine 14 for reaming. The mud 11 configured by water, clay (bentonite) and additives is used for wall protection. Then pour concrete of C30 strength grade into the reaming place to form the enlarged end 6 at the bottom of the pile.
[0039] refer to figu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com