Construction site power utilization period and overload controlling method and power distribution device
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- CHINA CONSTR FOURTH ENG DIV INSTALLATION ENG
- Publication Date
- 2015-06-24
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2
Abstract
Description
technical field
[0001] The invention relates to a construction site power consumption period and overload control method and a power distribution device, belonging to the technical field of construction site power distribution. Background technique
[0002] In building construction, the management of power consumption is not standardized, and the construction power and domestic power consumption in many construction sites are usually not set separately. Workers in some dormitories often forget to turn off the power when they leave the dormitory. In some dormitories, the lights are always on. What is more dangerous is that some people are using electric stoves to boil water or cook. If there is an emergency, they forget to turn off the electric stove, which is likely to cause electrical safety accidents. . Although the construction site also has strict rules and regulations, it is strictly forbidden to connect the power cord without permission in the dormitory of the constru...