Abstract
Description
technical field
[0001] The invention relates to the field of deep foundation construction in highly permeable strata, in particular to a bottom-sealing and water-stopping structure for deep foundation pits in highly permeable strata and a construction method thereof. Background technique
[0002] At present, in deep foundation pit engineering, three methods are usually used to solve the engineering problems caused by confined water, such as precipitation outside the pit, vertical partition of curtain, and full grouting of the base.
[0003] The first such as figure 1 The method of dewatering outside the pit, the design idea of this method is: adopt the underground diaphragm wall as the enclosure structure, after the enclosure structure is completed, first carry out the construction of reducing the confined water inside and outside the pit, and when the confined water head drops to the design requirement Excavation of the foundation pit will be carried out after the elevat...