Amphibians crossing channel ecological module
A technology for amphibians and ditches, applied in water conservancy projects, water conservancy engineering equipment, buildings, etc., can solve the problem of high mortality of amphibians crossing ditches
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Embodiment 1 Amphibians cross the ecological module of the ditch
[0018] Such as figure 1 As shown, the ecological module for amphibians to cross the ditch includes: ditch body passage 1, ditch bottom climbing board 3, reflective heat insulation board 7, bracket 6, guide guard plate 5; There are fixing devices, which are fixed on both sides of the ditch; guide guards 5 are provided on both sides of the ditch body channel 1, and the side of the ditch body channel 1 in the direction of ditch water flow is provided with a ditch bottom climbing plate 3, which passes through the shaft 8 and the guide guard 5 Splicing; the reflective heat shield 7 is fixed on the ditch channel 1 through the bracket 6;
[0019] The climbing plate 3 at the bottom of the canal is provided with densely covered holes with a diameter of 20 mm, made of 304 stainless steel, which falls into the side of the canal bottom in the direction of the water flow in an inverted trapezoidal shape, to guide th...
Embodiment 2
[0022] Embodiment 2 The ecological module of amphibians crossing the ditch
[0023] See figure 1 figure 2 , an ecological module for amphibians to cross the ditch, which includes: ditch channel 1, ditch bottom climbing board 3, reflective heat insulation board 7, bracket 6, guide guard 5; the front and rear ends of the ditch channel 1 are provided with fixed The device is fixed on both sides of the ditch; the two sides of the ditch body channel 1 are provided with guide guards 5, and the side of the ditch body channel 1 in the ditch water outflow direction is provided with a ditch bottom climbing plate 3, which is hinged with the guide guard 5 through the shaft 8 ; The reflective heat insulation board 7 is fixed on the ditch channel 1 through the bracket 6;
[0024] Climbing board 3 at the bottom of the canal is provided with densely covered holes with a diameter of 20 mm. The material is 304 stainless steel and is in an inverted trapezoidal shape. After the bottom, the an...
Embodiment 3
[0033] Embodiment 3 layout method
[0034] The steps of the layout method are as follows: First, determine the layout of the canal section, determine the relatively fixed migration route of amphibians and the canal section that is prone to death. The ditches that appear on the relatively fixed migration routes of amphibians need to pay special attention to their lethal and isolation effects on amphibians. For the reconstruction and expansion of ditches, the monitoring of the canal sections with higher lethality of amphibians should be monitored for at least one year. The large-scale migration of amphibians generally chooses a specific time in spring and autumn, and the best layout location should be determined based on the living habits and migration time of the main species. Focus on the ditches where there are micro-ponds nearby, and place under the forest with shade is the first choice. Among the deadly amphibian species, it is judged according to the protection level. The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com