[0026] The present embodiment provides a method for improving saline-alkali land, comprising the steps of:
[0027] S1: plow the saline-alkali land successively, the number of times is 3 times, and the plowing depth is 40cm; then, the number of times is 2 times, and the interval between each time is 8 days;
[0028] S2: Level the saline-alkali land after S1 treatment, and level the ground with high digging and low filling, with a maximum slope of 10°;
[0029] S3: The saline-alkali land after S2 treatment is used to drain the brine, and the buried depth of the salt-discharging buried pipe is 1.3m, and the slope ratio is 0.7‰. 30m; the salt discharge concealed pipe is a single-wall corrugated pipe with a hole in diameter of 11cm, and is covered with 15cm thick sand and gravel material;
[0030] S4: Irrigate the saline-alkali land after the treatment of S3 with a water depth of 3 cm and last for 11 days;
[0031] S5: Apply a saline-alkali land improver to the saline-alkali land ...
Embodiment 2
[0033] The present embodiment provides a method for improving saline-alkali land, comprising the steps of:
[0034] S1: plow the saline-alkali land successively, the number of times is 4 times, and the plowing depth is 35cm; then, the number of times is 2 times, and the interval between each time of drying is 10 days;
[0035] S2: Level the saline-alkali land after S1 treatment, and level the ground with high excavation and low filling, with a maximum slope of 11°;
[0036] S3: The saline-alkali land treated by S2 is drained of brine with a buried pipe. The buried depth of the buried salt pipe is 1.4m, and the slope ratio is 0.8‰. 30m; the salt discharge concealed pipe is a single-wall corrugated pipe with a hole in diameter of 11cm, and is covered with 15cm thick sand and gravel material;
[0037] S4: Irrigate the saline-alkali land after the treatment of S3, with a water depth of 4 cm, and last for 10 days;
[0038] S5: Apply a saline-alkali land improvement agent to the s...
Embodiment 3
[0040] The present embodiment provides a method for improving saline-alkali land, comprising the steps of:
[0041] S1: plow the saline-alkali land successively, the number of times is 5 times, and the plowing depth is 30cm; then, the number of times is 3 times, and the interval between each time is 9 days;
[0042] S2: Level the saline-alkali land after S1 treatment, and level the ground with high digging and low filling, with a maximum slope of 12°;
[0043] S3: The saline-alkali land treated by S2 is drained of brine with a buried pipe. The buried depth of the buried salt pipe is 1.5m, and the slope ratio is 0.9‰. There are several parallel pipes, and the distance between two adjacent pipes is is 40m; the salt discharge concealed pipe is a single-wall corrugated pipe with a hole in diameter of 11cm, and is covered with 15cm thick sand and gravel material;
[0044] S4: Irrigate the saline-alkali land after the treatment of S3, with a water depth of 5 cm, and last for 9 days...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com