A method for determining the plugging strength required for temporary plugging in fractures
A strong, natural fracture technology, applied in the direction of earthwork drilling, sealing/isolation, borehole/well components, etc., can solve the problems of lack of effective guidance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] In order to better understand the purpose, structure and function of the present invention, a method for determining the plugging strength required for temporary plugging in the fracture will be described in further detail below in conjunction with the accompanying drawings.
[0012] The plugging strength required for temporary plugging in fractures refers to adding temporary plugging materials to the ends of fractures or in fractures during construction to increase the net pressure until a large number of natural fractures are opened. Net pressure value p 1 (the net pressure after adding temporary plugging materials to open a large number of natural fractures) and the net pressure value p that can be achieved in fractures without adding temporary plugging materials 2 The difference is the plugging strength (p 1 -p 2 ),
[0013] Such as figure 1 As shown, the present invention provides a method for determining the required plugging strength for temporary plugging in...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


