A construction device and prestressing technology, which is applied in the direction of infrastructure engineering, buildings, sheet pile walls, etc., can solve problems such as potential safety hazards, instant tension, and inability to tension anchor cables, and achieve the effects of ensuring safety and controlling losses
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0080] like figure 1 As shown in the figure, the construction device for compensating the prestress loss of the anchor cable is arranged on the outside of the support structure 4 to be anchored, including the jacking device 11 and the anchor 12 for anchoring the anchor cable 2. The anchor 12 is connected with a pressure-bearing member 13, and an installation space 15 is formed between the pressure-bearing member 13 and the anchor pier 3 for installing the jacking device 11, the jacking device 11 is installed on the anchor pier 3, and the jacking device 11 The jacking end 111 is in contact with the pressure-bearing member 13 , so that when the jacking device 11 is jacked up, the anchoring device 12 is driven to pull out the anchor cable 2 .
[0081] After the anchor cable is tensioned, it is connected to the anchor, and the anchor and the anchor cable are connected into an integrated structure and then fixed on the anchor pier, so as to ensure the stability of the anchoring pro...
Embodiment 2
[0099] The construction device of this embodiment is roughly the same as that of Embodiment 1, the difference is that the construction device of this embodiment adopts automatic control to realize the compensation of the prestress loss of the anchor cable, as follows:
[0100] like figure 1 and Image 6 As shown, the construction device 1 is also connected with an automatic control system 6, including a monitoring device 51 for monitoring the stress change of the anchor cable 2, and a control device 52 connected with a power system 53, and the monitoring device 51 is installed on the anchor cable 2. , the control device 52 is used to control the lifting of the jacking equipment 11, the control device 52 and the monitoring device 51 are connected to the automatic control module 54A at the same time, the automatic control module is installed in the control box 54, the control device 52, A hydraulic line 55 is used to connect the power system 53 and the jacking device 11 .
[0...
Embodiment 3
[0109] like figure 1 As shown in the figure, the compensation construction method to compensate the prestress loss of the anchor cable includes the construction of the anchor cable hole, the production and installation of the anchor cable, the grouting, the construction of the anchor foundation and the tension locking. During the construction of the anchor foundation, the arrangement is as follows: The above-mentioned construction device is used to compensate the prestress loss of the anchor cable after the anchor cable is tensioned and locked, and specifically includes the following steps:
[0110] a. Install an anchor cable axial force meter on the anchor cable 2 for monitoring the axial force or tensile force of the anchor cable 2;
[0111] b, the installation of the anchor 12, including connecting the pressure-bearing member 13 on the anchor 12;
[0112] c. Tension and lock the anchor cable 2;
[0113] d. Arrange the jacking device 11 on the anchor pier 3. An installatio...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com