CTE technology maturity evaluation method and project technology maturity evaluation method

A technology with technical maturity and evaluation methods, applied in the field of high-tech industries, it can solve the problems of not specifying the process in detail, not applicable to nuclear power and nuclear power fields, and poor applicability and operability, so as to improve the evaluation Efficiency, ease of traceability, effect of reducing repetitive workload

A technology with technical maturity and evaluation methods, applied in the field of high-tech industries, it can solve the problems of not specifying the process in detail, not applicable to nuclear power and nuclear power fields, and poor applicability and operability, so as to improve the evaluation Efficiency, ease of traceability, effect of reducing repetitive workload

CN107705016APending Publication Date: 2018-02-16NUCLEAR POWER INSTITUTE OF CHINA

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • CTE technology maturity evaluation method and project technology maturity evaluation method
  • CTE technology maturity evaluation method and project technology maturity evaluation method
  • CTE technology maturity evaluation method and project technology maturity evaluation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0055] Embodiment 1 carries out technical maturity assessment to CTE

[0056] Such as figure 1 As shown, in the specific implementation, the evaluated party submits the evaluation application report to the evaluation management, initiates the evaluation work application, and the management reviews the application report. If the application is approved, the management is responsible for setting up the evaluation executive organization and expert group.

[0057] Evaluation implementation: The evaluation executive agency starts the evaluation work, and cooperates with the evaluated party to formulate the evaluation work plan, which includes the overview of the project, the information of the evaluation work organization personnel, and the evaluation work schedule. The evaluation executive agency designates the corresponding experts in the expert database, and organizes the expert group to perform the following operations:

[0058] (1) Establish a technology maturity assessment f...

Embodiment 2

[0085] Example 2 Evaluation of the technical maturity of the system

[0086]In specific implementation, the evaluated party submits the evaluation application report to the evaluation management, initiates the evaluation work application, and the management reviews the application report. If the application is approved, the management is responsible for setting up the evaluation executive organization and expert group. Evaluation preparation can also be carried out by the evaluated party: organize the basic information of the project, clarify the evaluation object, and confirm the current technical status of the evaluated object; implement self-evaluation work, carry out project breakdown structure compilation, CTE identification, and CTE TRL according to the evaluation process Finally, the system maturity is calculated based on the weighted average method and the short board method; the self-evaluation report and the evaluation application report are prepared by referring to t...

Embodiment 3

[0097] Embodiment 3 Formulate key technology research technologies based on the system technology maturity report generated by the system technology maturity evaluation method

[0098] The system technology maturity report generated by the above-mentioned system technology maturity evaluation method is applied in the key technology research for the weak links of the project found in the evaluation. The specific application is: use the current technology provided by the TRA report The gap between the state information and the target state, and carry out key technology research planning for the weak links of the project found in the evaluation. The specific method is based on the current technology maturity level of the key technology, the technology maturity target level of the final goal and the stage goal, Refer to the definition of technology maturity level and evaluation level conditions to compare and plan each level in the process of tackling key problems one by one until ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a CTE technology maturity evaluation method. The method comprises the steps of (1) establishing a technology maturity evaluation framework; (2) according to the technology maturity evaluation framework, establishing a technology maturity evaluation general rule; (3) conducting the iteration judgment according to the technology maturity evaluation general rule, and obtaininga final evaluation result. According to the evaluation method, a scientific evaluation criterion, a standard evaluation process and an explicit evaluation organization are established, so that the evaluation method is scientific and efficient, clear in organization duties, standard in process and easy in operation. The evaluation process is convenient for achieving unified management and traceability.

Description

technical field [0001] The invention relates to high-tech industrial fields such as nuclear power, nuclear power, aerospace, shipbuilding, petrochemicals, etc., and specifically relates to a project and a method for evaluating the maturity of CTE technology. Background technique [0002] Delaying progress, increasing costs, and degrading performance" are common problems in the procurement of weapons and equipment and scientific research project management in countries all over the world. In project management, technical risk is often the most important factor determining the success of a project. How to measure the impact of technology on project goals The degree of satisfaction? How to more accurately grasp the maturity of technology? It is a difficult problem faced by scientific research managers. [0003] The technology maturity evaluation method is a systematic method and process for evaluating technology maturity based on technology development and project development r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
16 Feb 2018
Publication
CN107705016A
IPC
G06Q10/06
CPC
G06Q10/06393; G06Q10/0635
Inventors
陈青; 李朋州