Manufacturing method of water paint box
A manufacturing method and technology of water-based paint, applied in the field of containers, can solve problems such as the influence of water-based paint box product quality, and achieve the effects of good drying and ventilation effect, overcoming the difficulty of sanding treatment, and overcoming the effect of poor ventilation effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 approach
[0047] The water-based paint box of the present invention includes a bottom frame, a door end, a left side, a top plate 101, a right side 102, a front end and a floor. This embodiment provides a method for manufacturing a water-based paint box, which includes the following steps:
[0048] Step S101: Connect the bottom frame with the door end, the left side, the right side, and the top plate to form a first assembly with a front end opening;
[0049] Step S102: spray paint on the first assembly;
[0050] Step S104: drying the first assembly after spraying;
[0051] Step S105: spray paint again on the dried first assembly;
[0052] Step S106: Drying the first assembly again after painting again;
[0053] Step S107: Connect the first assembly after the re-drying process and the box plate that closes the opening at the front end after the spray paint has been dried to form the box body of the water-based paint box.
[0054] Specifically, the door end of the water-based paint box is connected...
no. 2 approach
[0065] The difference between this embodiment and the first embodiment is that the front end 203 of the water-based paint box has an opening 204. Specifically, this embodiment provides a method for manufacturing a water-based paint box, which includes the following steps:
[0066] Step S101': Connect the bottom frame with the door end, left side, right side, top plate and front end;
[0067] Step S102': opening the front end after connection to form a first assembly with openings;
[0068] Step S103': spray paint on the first assembly;
[0069] Step S104': drying the sprayed first assembly;
[0070] Step S105': spray paint again on the dried first assembly;
[0071] Step S106': drying the first assembly again after painting again;
[0072] Step S107': closing the opening of the first assembly after the re-drying treatment to form the box of the water-based paint box.
[0073] Specifically, the door end and the front end 203 of the water-based paint box are respectively connected to both e...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

