Empty wall drainage waterproof tunnel
A technology for empty walls and tunnels, applied in tunnels, drainage, tunnel linings, etc., to achieve the effects of improving tunnel durability, driving safety, and reducing damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0046] The specific implementation procedure of the empty wall drainage and waterproof tunnel basically follows the previous practice, removing unnecessary items and filling in supplementary items. The main procedures are: tunnel excavation, bolt construction, shotcrete or component support, concrete pad construction (prefabrication and installation), drainage and waterproof layer construction (waterproof geotextile, steel (plastic) wire mesh, cement mortar and polymer Polyethylene polypropylene fiber), side wall foundation and its drainage groove construction, secondary lining concrete pouring, longitudinal drainage ditch, horizontal drainage ditch and central drainage ditch construction under the tunnel pavement, ventilation and load-bearing ditch construction, road construction and water, electricity, Communication equipment installation.
[0047] 1. Tunnel excavation shall be carried out according to the general method in the past, and controlled according to the design se...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com