Overall online verification method of high-voltage electric energy metering device
A technology of metering device and high-voltage electric energy, applied in the direction of measuring device, measuring electrical variables, instruments, etc., can solve the problems of increasing the burden of power supply reliability, affecting the normal power consumption of users, and poor data reliability, and achieving high reliability. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] The overall online verification method for the high-voltage electric energy metering device described in this embodiment, the method includes:
[0031] The overall on-line verification method of the high-voltage electric energy metering device, the method includes:
[0032] S1: The wireless meter reading terminal sends the power consumption data of the high-voltage electric energy metering device to the metering master station, and the metering master station generates and stores the load curve according to the received power consumption data;
[0033] S2: Define N fixed verification periods and M load verification periods respectively according to the daily time period and load curve, where M and N are both positive integers greater than 1;
[0034] S3: The high-voltage electric energy metering device to be calibrated is connected in series with the current line of the standard meter, and the high-voltage electric energy metering device to be calibrated is connected in...
Embodiment 2
[0042] In this embodiment, on the basis of Embodiment 1, the number of load segments and fixed verification periods is changed, among which, five load segments are set, which are respectively high load segment, medium-high load segment, medium load segment, medium-low load segment and For the low load segment, the load verification period corresponding to the high load segment is 10 minutes before and after the time corresponding to the highest load value, and the load verification period corresponding to the medium and high load segment is 0.75*10 minutes before and after the time corresponding to the highest load value. Minutes, the load verification period corresponding to the medium load segment is 0.5 * 10 minutes before and after the time corresponding to the highest load value, and the load verification period corresponding to the medium and low load segment is 0.25 * 10 minutes before and after the time corresponding to the highest load value , the load verification per...
Embodiment 3
[0044] This embodiment adds new steps on the basis of embodiment 1, specifically:
[0045] S61: Compare the load of the checked high-voltage electric energy metering device in each time period obtained in step S4 with the load in each time period defined in step S2 when the checked high-voltage electric energy metering device was installed on the first day, one by one, if there are two If the compared loads are in the same load range, then further compare the measurement errors of the corresponding high-voltage electric energy metering devices under the two loads. If the difference between the two does not exceed the preset value, the high-voltage electric energy metering device to be calibrated is defaulted.
[0046] S62: Compare the load of the checked high-voltage electric energy metering device obtained in step S4 in each time period with the load of the checked high-voltage electric energy meter in each time period during previous calibrations one by one. If there are two ...