Risk Analysis Method for Hierarchical Operation in Guaranteed Power Supply Area Based on the Integration of Main and Distribution
A technology of operation risk and analysis method, applied in data processing applications, instruments, calculations, etc., can solve the problems of lack of main network path information, unable to monitor the power supply status of the main network, and achieve the effect of ensuring the reliability of power supply
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0019] According to the risk analysis method of the hierarchical operation of the guaranteed power supply area based on the integration of the main distribution network, the integrated model of the main distribution network and the real-time operation mode are obtained first, and the power supply path of the target device is searched through the network topology analysis, and the power supply path search is based on the connection relationship of the equipment As well as power flow information, count all the primary equipment on the power supply path, find the backup power point of the bus with different voltage levels, obtain the power supply configuration information of different voltage levels on the power supply path, combine the power supply risk expert database, and evaluate the risk of the power guarantee user grade.
...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
