A kind of construction method for strengthening and strengthening karst cave of underground pile foundation
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A construction method and technology for pile foundations, which are applied in basic structure engineering, chemical instruments and methods, filling and other directions, can solve problems such as geological disasters, damage to piling equipment, casualties, etc., to reduce the strength of mountain piles and ensure stability. , the effect of increasing the amount of grouting
Active Publication Date: 2019-08-30
ARCHITECTURAL DESIGN RES INST OF GUANGDONG PROVINCE
View PDF4 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0003] (1) Collapsed hole: The hole wall is unstable and collapsed, and accidents such as stratum subsidence, damage to piling equipment, damage to additional buildings or underground pipelines, and even casualties may occur
[0004] (2) For broken piles of engineering piles, during the process of pouring concrete, if the concrete flows out due to underground karst caves, the integrity of the pile body concrete will be destroyed, and pile breaking accidents will occur
[0005] (3) Inducing geological disasters: The continued development of soil karst caves will cause uneven settlement or karst ground subsidence, induce geological disasters, affect the safe use of buildings, and even pose a threat to people's lives and property
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0044] Such as Figure 1 to Figure 5 The construction method for strengthening and strengthening the karst caves of underground pile foundations shown is suitable for pile foundations where the thickness of the bearing layer is less than 3 times the diameter of the pile body and the thickness of the bearing layer is less than 5 meters, and there are caves with a height of ≥ 3 meters below the bearing layer Pile foundation construction includes the following steps:
[0045] Step (1), advanced drilling: According to the investigation data of the project, it is shown that there are karst caves 5 in the site, and the advanced drilling is carried out before the pile is formed, and the advanced drilling depth should be drilled to the karst caves 5 below the bottom of the proven pile;
[0046] Step (2), opening: adopt pile driver to open pile hole 1 to the design elevation at the bottom of the pile;
[0047] Step (3), deep drilling: use a pile driver to drill the micro-steel pipe 2 to...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Property
Measurement
Unit
strength
aaaaa
aaaaa
particle size (mesh)
aaaaa
aaaaa
Login to View More
Abstract
The invention discloses a strengthening and reinforcing mountain piling construction method for an underground pile foundation cavern. The strengthening and reinforcing mountain piling construction method comprises the steps that (1), advanced drilling is conducted, specifically, the cavern situation of a site is displayed according to survey data of a project, advanced drilling is conducted before pile forming, and the advanced drilling depth should be drilled till the cavern situation below the pile bottom is proven; (2), hole forming is conducted, specifically, a pile hole is formed in thedesign elevation of the pile bottom; (3), deep drilling is conducted, specifically, a miniature steel pipe is drilled to the cavern bottom; (4), mountain piling is conducted, specifically, mountain piling comprises dredging, discharging for stacking and filling, grouting for consolidation and re-inspection; and (5), pile forming is conducted, specifically, the miniature steel pipe penetrates through a filler pile to be driven to the cavern bottom, a made steel reinforcement cage is put into the pile hole, pile body concrete is poured into a pile, and construction is completed. According to thestrengthening and reinforcing mountain piling construction method, the harm of the underground pile foundation cavern can be safely, quickly, economically, thoroughly and effectively treated, the construction safety and the pile forming quality of the project pile are guaranteed, and the bearing capacity and anti-deformation requirements of the structure are met.
Description
technical field [0001] The invention relates to a method for treating karst caves, in particular to a construction method for strengthening and reinforcing karst caves for underground pile foundations. Background technique [0002] With the continuous acceleration of urbanization in our country, the construction of urban infrastructure has been further developed, and the number of high-rise buildings is increasing, which puts forward higher requirements for the quality and safety of pile foundation construction. In the process of pile foundation construction, it is not uncommon to encounter bad geology of karst caves. Since pile foundation construction is an underground concealed project, karst caves bring great difficulties to pile foundation construction. If reasonable treatment is not carried out, there will be the following hazards : [0003] (1) Collapsed hole: The hole wall is unstable and collapsed, and accidents such as stratum subsidence, damage to pile driving too...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.