Construction device and operation method for sporadic concrete rapid pouring

A technology of construction device and operation method, which is applied in the processing of building materials, construction, building maintenance, etc., can solve the problems of cumbersome procedures and high construction costs, and achieve the effects of ensuring safety, easy operation, and eliminating hidden dangers of leakage

Pending Publication Date: 2019-03-12
CHINA MCC17 GRP
View PDF1 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Aiming at the problems of complicated procedures and high construction cost in the sporadic concrete construction process in the prior art, the present invention provides a construction device and operation method for quickly pouring sporadic concrete

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction device and operation method for sporadic concrete rapid pouring
  • Construction device and operation method for sporadic concrete rapid pouring

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] A construction device for quickly pouring sporadic concrete in this embodiment, such as figure 1 As shown, it includes a square concrete member 4, a template 2 and a bolt 3; the middle part of the concrete member 4 is a reserved hole 5, and the two sides of the reserved hole 5 are symmetrical pre-buried pre-embedded bolt hole supporting sleeves 1; The template 2 completely covers the reserved hole 5, and the reserved bolt holes 6 are symmetrically arranged on the template 2. After the bolt holes 6 are left, they are screwed with the supporting sleeve 1 of the embedded bolt holes, and the reserved holes 5 are sealed.

[0034] A construction device for rapid pouring of sporadic concrete in this embodiment can be applied to pump openings, measurement and setting-out openings, water-side fire-fighting pipeline openings, electrical cable holes, and aluminum mold material transfer holes. The setting of the matching sleeve 1 for the pre-buried bolt holes enables the shutterin...

Embodiment 2

[0036] A construction device for quickly pouring sporadic concrete in this embodiment, the basic structure is the same as that of Embodiment 1, and the improvement is that it is applied to the reserved holes of temporary construction facilities in indoor fine decoration construction, such as measuring the setting-out hole, the maximum side of the hole The length is ≤500mm, specifically 500*15mm, the hole is small, the working surface is small, and the corresponding operating space is small, so as to achieve the purpose of fast and effective construction. The template 2 can be made of wood or plastic, and the specification is 600*18mm. Bolt 3 can use the bolt of specification M16. The pre-embedded bolt holes are matched with the plastic material of the sleeve 1, which is easy to obtain and can be adapted to local conditions, so that the construction can be carried out quickly and the construction cost can be reduced.

Embodiment 3

[0038] A construction device for rapid pouring of sporadic concrete in this embodiment has the same basic structure as that of Embodiment 2, and the improvement is that the distance between the reserved bolt holes 6 and the ends of both sides of the formwork 2 is not less than 50 mm, so as to avoid excessive gaps during construction. Narrow, causing template 2 to be damaged and unable to seal effectively. The size of the template 2 is slightly larger than the reserved hole 5, for example, 5 to 10mm larger, so as to achieve the purpose of complete coverage.

[0039] The operation method of the construction device of the quick pouring sporadic concrete of present embodiment, as figure 2 As shown, the steps are:

[0040] Step 1. Pre-embedded sleeves: pre-embed symmetrical pre-embedded bolt hole supporting sleeves 1 on the concrete members 4 on both sides of the reserved hole 5;

[0041] Step 2. Sealing: After designing the template 2 of corresponding specifications according t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction device and operation method for sporadic concrete rapid pouring, and belongs to the technical field of building construction processes. The construction device comprises a square concrete member, a formwork and a bolt; a reserved hole is formed in the middle of the concrete member, and the two sides of the reserved hole are symmetrically-pre-embedded pre-embedded bolt hole mating sleeves; the formwork completely covers the reserved hole, reserved bolt holes are symmetrically arranged on the formwork, the reserved bolt holes are matched with the pre-embedded bolt hole mating sleeves, the formwork is inserted into the reserved bolt holes through a bolt and is screwed with the pre-embedded bolt hole mating sleeves, the reserved hole is sealed, through the setting of the pre-embedded bolt hole mating sleeve, the sealing operation of the formwork to the reserved hole can be carried out in an orderly and efficient manner, and the rapid pouring of the poradic concrete can be achieved to effectively eliminate leakage hazards.

Description

technical field [0001] The invention belongs to the technical field of building construction technology, and in particular relates to a construction device and an operation method for rapidly pouring sporadic concrete. Background technique [0002] During the structural construction process, there are often reserved holes for temporary construction facilities such as pump holes, measuring and setting-out holes, fire-fighting pipeline holes near water, cable holes near electricity, aluminum mold material transfer holes (the maximum side length of the hole is ≤500mm), and each structure There are a large number of secondary hanging hole construction tasks in the reserved openings in the layer. Therefore, sporadic concrete construction such as reserved openings on site is a key process of concrete engineering and an important part of engineering construction. The quality of its pouring has also been increasingly recognized. More and more people pay attention. However, the exis...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04G23/02E04G21/02
CPCE04G21/02E04G23/0203
Inventor 关永莹张所杰刘生强
Owner CHINA MCC17 GRP