Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

33results about How to "Orderly construction" patented technology

Detachable support applied to lifting of small-sized electric power device and construction method thereof

The invention discloses a detachable support applied to lifting of a small-sized electric power device and a construction method of the detachable support applied to lifting of the small-sized electric power device. The detachable support applied to lifting of the small-sized electric power device is characterized in that the detachable support is vertically arranged on one side of a concrete pole support of the electric power device, the detachable support is an inverted-L-shaped support which is composed of a perpendicular stand rod and a transverse alloy beam fixed to the top of the perpendicular stand rod, a top fixed pulley is hung on the transverse alloy beam, the perpendicular stand rod is fixed to one side of the concrete pole support (1) through U-shaped hoops, a bottom fixed pulley is fixed to the lower portion of the concrete pole support through a steel wire rope, and a rope connected to the small-sized electric power device surrounds the top fixed pulley and the bottom fixed pulley in sequence. The detachable support applied to lifting of the small-sized electric power device and the construction method of the detachable support applied to lifting of the small-sized electric power device can achieve the purpose of lifting construction of the small-sized electric power device on the construction site with a narrow and small space, the area of a power outage of the construction site and influence on surrounding users are reduced, and construction efficiency and operation flexibility are improved.
Owner:STATE GRID CORP OF CHINA +1

Shallow sea region land and sea mixed rock riprap method for dynamic planning

The invention discloses a shallow sea region land and sea mixed rock riprap method for dynamic planning. The method comprises the following steps of: (1) performing construction preparation, dividing construction grids through a beacon machine, and measuring and controlling the position of a rock riprap ship through global position system (GPS); (2) performing opening body barge rock riprap construction when the water depth is more than 1m, performing flat plate barge rock riprap construction when the water depth is close to 1m, and coordinating the two ships to perform seaborne rock riprap embankment fill; (3) performing vertical riprap construction through a land low tide or when the riprap embankment is exposed out of the water surface; (4) performing water depth and settlement observation in real time, combining the tide information, and dynamically planning the rock riprap position and the rock riprap quantity; and (5) employing a large-side small-middle rock riprap method in the total rock riprap process, and performing impact rolling reinforcement on the embankment after the rock riprap is finished. According to the method, the construction period can be effectively shortened, the construction safety is improved, the possibility of error riprap and erosion is reduced, and the construction cost is greatly reduced.
Owner:ZHEJIANG UNIV OF TECH

Support scaffold for ancient building gallery bridge and construction method of support scaffold

The invention discloses a support scaffold for an ancient building gallery bridge and a construction method of the support scaffold. The support scaffold comprises support base frames, support connecting rods and a reinforcing plate, the reinforcing plate is arranged between the support connecting rods, and the support connecting rods are arranged between the support base frames; and each support base comprises a base, first arch ribs, second arch ribs, third arch ribs, a beam frame, a support transverse frame and a support rod, the first arch ribs are arranged between the base and the beam frame, the second arch ribs are arranged between the base and the support transverse frame, the third arch ribs are arranged between the beam frame and the support rod, and the support rod penetrates through the support transverse frame. The construction method comprises the following steps of (a) clearing a workyard; (b) constructing a frame; (c) assembling the support base frames; (d) reinforcing; and (e) monitoring. According to the support scaffold for the ancient building gallery bridge and the construction method of the support scaffold, connecting of the support scaffold is flexible, disassembling and assembling are convenient, repairing is convenient, the anti-load capacity is high, the steadiness and the endurance are achieved, the construction method is simple, the construction period is short, the construction quality is easy to control, transportation of materials is convenient, and the construction cost is low.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Hoisting design method of steel structure in engineering

The invention discloses a hoisting design method of a steel structure in engineering. The hoisting design method comprises the following steps that area dividing is conducted based on engineering requirements, and the size of each area is planned and designed based on preset functional requirements; relative materials and necessary construction equipment and devices are sent to the areas based onengineering actual requirements; and an initial hoisting position is set based on the engineering drawing design, and hoisting is achieved by corresponding hoisting methods based on truss classification. According to the hoisting design method of the steel structure, construction can be endured to be conducted safely and quickly, manpower and material resources can be saved, and the total hoistingcost is lowered.
Owner:JIANGSU PERMANENT STEEL STRUCTURE

Foundation pit earthwork construction method for civil air defense engineering

The invention relates to a foundation pit earthwork construction method for civil air defense engineering, and belongs to the technical field of civil air defense engineering construction. The foundation pit earthwork construction method for civil air defense engineering comprises the steps that step 1, after surveying and setting out of a deep foundation pit are completed, the deep foundation pit is divided into M areas from south to north, each area is divided into N<q> construction sections from west to east, and the corresponding mark number of each construction section is defined as MN<q> (p is larger than 2, q is larger than 4, and p and q are both positive integers); step 2, before the corresponding construction section is excavated, precipitation pipe well construction is conducted on the construction section; step 3, according to a foundation pit design drawing, excavation is conducted in a partitioned, segmented and layered mode from west to east in a backward sequence; when a (q-1) th foundation pit is excavated, layered excavation is carried out from west to east, excavation sections are M<1>N<q-1>, M<2>N<q-1>... MN<q-1> sections, excavation sections of a qth foundation pit are M<1>N<q>, M<2>N<q>... MN<q> sections, layered excavation is carried out from south to north, and riding tracks are arranged at the M<1>N<q> section; and step 4, according to the mode in step 3, excavation of the foundation pit is completed. The construction efficiency can be improved, and the construction quality is guaranteed.
Owner:CHINA CONSTR SENVENTH ENG BUREAU INSTALLATION ENG

Self-anchorage cable bent tower driving cross brace arranging method

The invention discloses a self-anchorage cable bent tower driving cross brace arranging method. The method comprises the following steps of 1 machining a cross brace body, 2 machining a steel casing pipe, 3 lifting a cross brace body and the steel casing pipe, 4 installing a jack and 5 performing welding and fixing. The overall anti-bending capacity of the cable bent tower can be improved, a transverse brace steel tube bearing beam and a steel casing pipe bearing beam are arranged inside the cross brace steel pipe and the steel casing pipe in advance respectively, then, in the installing process, the jack can synchronously act on the cross brace steel pipe and the steel casing pipe according to the designed jacking force, and then the movable connection portion of the cross brace steel pipe and the steel casing pipe is welded and fixed after the cross brace steel pipe and the steel casing pipe are in place; according to the method, under the concrete dead-weight construction load and wind load effect, the pylon root pulling stress can be greatly lowered, and therefore the pylon generate no crack; it is ensured that construction is performed in order while the construction quality is ensured; meanwhile, construction of the cross brace is convenient, and the construction safety and stability can be improved.
Owner:ROAD & BRIDGE INT +1

Field pile hole interior soil cleaning machine for constructional engineering

The invention discloses a field pile hole interior soil cleaning machine for constructional engineering. The field pile hole interior soil cleaning machine for constructional engineering comprises a base and a soil cleaning mechanism, wherein the upper end of the base is fixedly connected to a supporting pipe, a first transmission mechanism is rotatably arranged on the side wall of the supporting pipe in a penetrating mode, a lifting mechanism is slidably arranged in the supporting pipe, the lifting mechanism is in transmission connection with the first transmission mechanism, the upper end of the lifting mechanism is fixedly connected to a transverse plate, the lower end of the transverse plate is provided with a moving mechanism, the lower end of the moving mechanism is fixedly connected to a vertical rod, the soil cleaning mechanism is fixedly arranged at the lower end of the vertical rod, the upper end of the soil cleaning mechanism is fixedly connected to a compaction mechanism, a horizontal plate is fixedly connected to the side wall of the supporting pipe, a second transmission mechanism is rotatably arranged on the horizontal plate in a penetrating mode, the second transmission mechanism is in transmission connection with the moving mechanism, and the second transmission mechanism is fixedly connected to the lifting mechanism. According to the field pile hole interior soil cleaning machine for the constructional engineering, while the soil cleaning is conducted, the inner wall of a pile hole can be further compacted, soil on the inner wall of the pile hole is prevented from collapsing, and in addition, the cleaned soil can be conveniently moved to a surrounding open space.
Owner:姚非

A kind of supporting arch used for ancient building covered bridge and its construction method

The invention discloses a support scaffold for an ancient building gallery bridge and a construction method of the support scaffold. The support scaffold comprises support base frames, support connecting rods and a reinforcing plate, the reinforcing plate is arranged between the support connecting rods, and the support connecting rods are arranged between the support base frames; and each support base comprises a base, first arch ribs, second arch ribs, third arch ribs, a beam frame, a support transverse frame and a support rod, the first arch ribs are arranged between the base and the beam frame, the second arch ribs are arranged between the base and the support transverse frame, the third arch ribs are arranged between the beam frame and the support rod, and the support rod penetrates through the support transverse frame. The construction method comprises the following steps of (a) clearing a workyard; (b) constructing a frame; (c) assembling the support base frames; (d) reinforcing; and (e) monitoring. According to the support scaffold for the ancient building gallery bridge and the construction method of the support scaffold, connecting of the support scaffold is flexible, disassembling and assembling are convenient, repairing is convenient, the anti-load capacity is high, the steadiness and the endurance are achieved, the construction method is simple, the construction period is short, the construction quality is easy to control, transportation of materials is convenient, and the construction cost is low.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

Perpendicularity and settlement monitoring system for constructional engineering based on Internet of Things

The invention belongs to the technical field of constructional engineering, particularly relates to a perpendicularity and settlement monitoring system for constructional engineering based on the Internet of Things, and aims to solve the problems that operation is inconvenient when settlement and perpendicularity of a building are measured and warning response is slower during construction. The system comprises an acquisition system, a database, a comparison module, a signal receiving module, a signal transmitting module and an alarm system, wherein the acquisition system comprises a website layout module, a data measurement module and a data recording module. According to the present invention, the perpendicularity and the settlement of the building are automatically measured and recorded through a perpendicularity sub-module and a settlement sub-module, the settlement and the perpendicularity of the building are rapidly calculated through an adjustment calculation sub-module and a geometric analysis sub-module, and the settlement and perpendicularity data of all places in the database are compared and checked, so that the rapid response is realized according to a threshold value module, and the timely alarm of the settlement and perpendicularity of the building is realized.
Owner:福建潭晟建筑工程有限公司

A design method and device for building construction based on bim

The invention discloses a design method for building construction based on Bim, the method comprising: obtaining first image information of a first curtain wall; obtaining a first unit plate of the first curtain wall according to the first image information of the first curtain wall information and the second unit plate information; obtain the first spatial position information of the first unit plate; obtain the second spatial position information of the second unit plate; judge whether there is a deviation angle between the first spatial position information and the second spatial position information; When there is a deviation angle between the first spatial location information and the second spatial location information, the first correction angle parameter is obtained; the first construction environment information of the first curtain wall is obtained; and the first correction angle parameter is corrected according to the first construction environment information and the first correction angle parameter. The first image information for the curtain wall. It solves the technical problem that due to the influence of the on-site construction environment on the actual construction, there will be a certain deviation in the construction according to the construction drawing, and the accuracy of the construction drawing is insufficient.
Owner:IANGSU COLLEGE OF ENG & TECH

A roof steel structure and its construction method

The invention discloses a roof steel structure. The roof steel structure comprises a concrete frame (1) encircled to form the roof contour, a plurality of main beams and a plurality of secondary beams, wherein the main beams and the secondary beams are arranged in the concrete frame (1). Each main beam is a beam string formed by a rigid beam (2), a lower chord rope (3) and a supporting rod (4). Each secondary beam is formed by a plurality of rigid secondary beam units (5). The two ends of the rigid secondary beam units located between two main beams are welded to the main beams on the two sides respectively. A roof steel structure construction process is further disclosed. The roof steel structure has the advantages that the matching application of the beam strings and the rigid beams is achieved, the beam strings and the rigid beams have complementary advantages, the roof steel structure has both the advantage of bearing vertical pressure through the beam strings and the advantage of bearing vertical and horizontal pressure and reverse pressure through the rigid secondary beams, so that the roof steel structure is good in stability; and compared with a rigid beam roof structure, the roof steel structure is light in self weight and convenient to construct.
Owner:中国华西企业股份有限公司

Adjustable calibration type electroslag pressure welding tool

The invention discloses an adjustable calibration type electroslag pressure welding tool, and relates to the field of electroslag pressure welding butt joint and measuring appliances. The adjustable calibration type electroslag pressure welding tool comprises a butt joint clamp and a measuring instrument arranged at one side of the butt joint clamp, the butt joint clamp comprises a deviation mechanism, an upper clamping mechanism and a lower clamping mechanism, and the deviation mechanism comprises an X-axis support, a lower sliding seat, a lower adjusting assembly, a Y-axis support, an upper sliding plate and an upper adjusting assembly. The X-axis support is connected with the top end of the lower clamping mechanism, lower sliding rails are mounted at the tops of the two side walls of the X-axis support, and a lower sliding seat is arranged between the two lower sliding rails. By arranging the lower adjusting assembly and the upper adjusting assembly, the angle and offset of an upper reinforcing steel bar can be adjusted, it is guaranteed that the axes of the upper reinforcing steel bar and the lower reinforcing steel bar are located at the same position after the reinforcing steel bar is welded, and the deviation angle of the welded steel bars meets the welding specification requirement; by adjusting and calibrating the butt joint of the upper steel bars and the lower steel bars, deviation generated in the welding process is reduced, and the overall safety of the structure is guaranteed.
Owner:HENAN UNIVERSITY

Construction method of tropical rainforest greenhouse steel structure

The invention discloses a construction method of a tropical rainforest greenhouse steel structure, the tropical rainforest greenhouse steel structure comprises a main arch and a reticulated shell, the main arch comprises a top main arch and two supporting structures located on the two sides of the top main arch, and each supporting structure comprises two arc-shaped supporting arches; one ends of the two arc-shaped supporting arches are connected to the top main arch, the other ends of the two arc-shaped supporting arches are separated, and the construction method comprises the steps that S1, the main arch is designed into a plurality of structural sections according to the shape of the main arch; s2, construction steps of each structural section are formulated, and a main arch is installed according to the construction steps; and S3, the reticulated shell is installed in a regional mode according to the shape of the main arch. According to the construction method, a construction scheme of the tropical rainforest greenhouse steel structure is provided, the tropical rainforest greenhouse steel structure is divided into a plurality of structural sections according to the actual structure of the tropical rainforest greenhouse steel structure, and rapid, ordered and high-quality construction of the tropical rainforest greenhouse steel structure is achieved.
Owner:THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU

A staggered construction method of floor-mounted tower cranes attached to the structure of super high-rise buildings

ActiveCN108868161BSelection is economical and reasonableArrangement logic is strictForms/shuttering/falseworksBuilding material handlingArchitectural engineeringTower crane
The invention discloses a staggered construction method for external attachment floor type tower cranes of a super high-rise building structure. The staggered construction method comprises the following steps: 1, mounting and positioning the double floor type tower cranes; 2, attaching a first tower crane of the first floor type tower crane on a wall; 3, jacking the first floor type tower crane; 4, hoisting a core cylinder; 5, constructing a steel-structure outer framework and attaching a second tower crane of the second floor type tower crane on the wall; 6, jacking the second floor type tower crane; 7, lifting the core cylinder again; 8, constructing the steel-structure outer framework again; 9, taking a (N+2Q)th layer of the steel-structure outer framework as an Nth layer structure of the steel-structure outer framework and circulating step 2. According to the staggered construction method disclosed by the invention, two sets of the common floor type tower cranes are distributed onan external wall of a building in a manner of staggering up and down and are used for carrying out alternating jacking construction, so that the engineering investment of construction units is reduced; the staggered construction method is not restricted by regional power supply of regions, is economical and reasonable and is convenient and safe to mount and dismount; a building technological levelof super high-rise buildings is promoted and reference and evidence are provided for construction of similar buildings in the industry.
Owner:SHAANXI CONSTR ENG GRP NO 7 BUILDING ENG

Tunnel lagging jack and construction method thereof

The invention discloses a tunnel lagging jack and a construction method thereof, and relates to the technical field of tunnel engineering composite lining construction. The tunnel lagging jack comprises a plurality of segmental lagging jacks, the segmental lagging jacks are connected to form the tunnel lagging jack, each segmental lagging jack is of a tubular structure, a connecting plate is arranged at the end part of the joint of every two segmental lagging jacks, and the segmental lagging jacks are connected through the connecting plates; and corrugated pipes penetrate into pipes of the tunnel lagging jack, prestress steel wire bundles penetrate into the corrugated pipes, and concrete is poured between the outer walls of the corrugated pipes and the inner walls of the segmental laggingjacks. The tunnel lagging jack is made of steel pipes, so that the strength and rigidity of the lagging jack can be effectively improved; concrete is injected into the steel pipes to further improve the strength and rigidity of the steel pipes; meanwhile, the corrugated pipes and prestress steel wire bundles can be arranged in the steel pipes, prestress is provided for the whole lagging jack, andthen the strength and rigidity of the tunnel lagging jack are further improved; and by the adoption of the tunnel lagging jack construction method, construction is orderly, and the construction periodis shortened.
Owner:CHINA 19TH METALLURGICAL CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products