Underground water nitrate treatment system and construction method thereof
A technology of treatment system and construction method, which is applied in the treatment of polluted groundwater/leachate, water/sewage treatment, adsorbed water/sewage treatment, etc., and can solve the problem that the treatment effect cannot meet the Grade III standard of groundwater quality.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] This embodiment provides a groundwater nitrate treatment system, which includes an underground in-situ treatment system and a surface secondary parallel treatment system.
[0032] The underground in-situ treatment system includes a water supply well and clay piles and PRB material piles arranged around the water supply well; in this embodiment, firstly, according to the water supply scale and maximum flow rate of the water supply well, determine the interval between the clay piles and the PRB material piles The construction scale of the in-situ treatment system; according to the local stratum conditions, the position of the continuous clay layer is mastered, and the installation depth of the clay pile and the PRB material pile is determined, that is, a circle is drawn within a certain radius with the water supply well as the center line, and The arc of the circle is the center line, which determines the position of the PRB material pile and the clay pile.
[0033] Speci...
Embodiment 2
[0045] This embodiment provides a construction method for a groundwater nitrate treatment system, including an underground in-situ treatment system and a surface secondary parallel treatment system; the underground in-situ treatment system includes a water supply well and clay piles arranged around the water supply well And PRB material pile, for example described underground in-situ treatment system is the underground in-situ treatment system described in embodiment 1; Described construction method comprises:
[0046] According to the water supply scale and maximum flow of the water supply well, determine the construction scale of the in-situ treatment system with clay piles and PRB material piles;
[0047] According to the local stratum conditions, grasp the position of the continuous clay layer, and determine the installation depth of the clay pile and the PRB material pile, that is, take the water supply well as the center line, draw a circle within a certain radius, and ta...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com