A power demand side project economic analysis method and system
A technology for power demand side and project economy, applied in data processing applications, instruments, calculations, etc., can solve problems such as low accuracy, lack of investment guidance, etc., and achieve the effect of improving accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] like figure 1 A method for economic analysis of power demand side projects is shown, including:
[0064] S1 selects the candidate equipment according to the obtained renovation content and operating constraints, and formulates a renovation plan by enumerating the candidate equipment;
[0065] S2 respectively replace the original equipment parameters with the equipment nameplate parameters of each renovation scheme, and use the forward push back generation power flow calculation method to determine the energy saving of each renovation scheme in the same time dimension;
[0066] S3 constructs energy saving energy investment cost function relational expression according to the energy saving energy of all renovation schemes and the pre-calculated investment cost, and determines the optimal renovation scheme according to the energy saving investment cost function relational expression.
[0067] S1 selects the candidate equipment according to the obtained renovation content ...
Embodiment 2
[0132] Embodiment 2: Based on the same inventive concept, the present invention also provides an economic analysis system for power demand side projects, including:
[0133] A formulating module, configured to select alternative equipment according to the acquired renovation content and operating constraints, and formulate a renovation plan by enumerating the candidate equipment;
[0134] The calculation module is used to replace the original equipment parameters with the equipment nameplate parameters of each renovation scheme, and determine the energy saving of each renovation scheme in the same time dimension by using the calculation method of forward push back generation;
[0135] A determination module is configured to construct a functional relational expression of energy-saving investment cost function according to the energy-saving energy of all transformation schemes and the pre-calculated investment cost, and determine the optimal transformation scheme according to th...
Embodiment 3
[0154] The basic process of the economic analysis method of a power demand side project based on accurate energy-saving calculation of the present invention may include: first, use GIS system, SCADA system, etc. to collect data such as topology structure, component parameters, and power consumption, and determine the need for The location of the transformation; secondly, according to the constraints of the operating conditions, select the alternatives for each transformation content, and enumerate all the transformation schemes that meet the conditions; then, calculate the total investment cost of each transformation scheme according to the investment cost calculation model of different transformation contents ; Then, substitute the modified parameters into the power flow calculation and calculate the energy saving of each renovation scheme; finally, fit the cost and energy saving of each scheme to obtain the "investment cost of energy conservation" of the renovation project Fu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com