Construction method of large floating maintenance door

A construction method and inspection door technology, which is applied in the field of hydraulic gate construction, can solve the problems of increasing the difficulty of anti-corrosion construction and the failure of lifting equipment to meet the requirements, and achieve the effects of reducing the workload of calibration, shortening the construction period, and improving efficiency
CN109967975AActive Publication Date: 2019-07-05CHINA GEZHOUBA GROUP MACHINERY & SHIP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
CHINA GEZHOUBA GROUP MACHINERY & SHIP
Publication Date
2019-07-05

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a construction method of a large floating maintenance door. The method comprises the following steps: (1) a first beam body, a second beam body, a third beam body, a fourth beam body, a fifth beam body and a sixth beam body are assembled; (2) a truss is assembled; (3) edge columns are assembled; (4) a maintenance door lower half body is manufactured; (5) a fender is assembled on the truss to manufacture a maintenance door middle body; (6) a maintenance door upper half body is manufactured; (7) a whole maintenance door is manufactured; (8) the edge columns are mounted onthe whole maintenance door; (9) the corrosion-resistance treatment is performed on the whole maintenance door; and (10) the construction of the large floating maintenance door is finished through assembly and welding. The construction method of the large floating maintenance door can solve the problems of assembly and corrosion resistance of the large floating maintenance door, is simple, feasible and convenient for corrosion-resistance construction, and greatly reduces the tonnage requirements on lifting equipment.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the field of construction of hydraulic gates, in particular to a construction method of a large floating inspection gate. Background technique

[0002] At present, the floating inspection door is usually constructed by the method of overall assembly and overall anticorrosion. With the country's vigorous construction of the Yangtze River Basin, there are more and more large-scale hydropower stations, and the floating inspection door is getting bigger and bigger. The large floating inspection door The gate length is greater than 35m; the maximum gate width is greater than 5m. The lifting equipment of the existing Yangtze River Basin manufacturing plant cannot meet the requirements, and the existing overall anti-corrosion construction method greatly increases the difficulty of anti-corrosion construction. Contents of the invention

[0003] The technical problem to be solved by the present invention is to provide a construction m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine