Economic quantification model of power distribution network project for power distribution network operation performance improvement degree
A technology of operating performance and quantitative models, applied in marketing, market forecasting, instruments, etc., can solve problems such as the increase and decrease of costs are not clearly reflected, it is difficult to reflect the increase in benefits, and the cost performance of the project is not friendly, so as to reduce the rate of curtailment of light and wind , reduce spare capacity, and reduce cost consumption
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2019-12-13
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2
Abstract
Description
technical field
[0001] The invention relates to the field of evaluating the degree of improvement of distribution network operation performance in the electric power industry, in particular to the quantitative analysis of the specific economic benefits and costs brought about by the distribution network project to improve the distribution network operation performance. Background technique
[0002] The post-project evaluation index system of distribution network projects generally evaluates distribution network projects comprehensively from the aspects of distribution network project implementation, distribution network operation performance after implementation, economic investment costs and benefits, social impact and technological development. Among the various indicators, the core point that investors are most concerned about is the two items of economic investment cost benefit after the implementation of distribution network operation performance improvement machine. Th...
Examples
Embodiment Construction
[0040] An example is used to introduce how to use the above model to evaluate the degree of improvement of the distribution network project to the performance of the distribution network and its economy.
[0041] A power company builds an urban distributed photovoltaic access project at its network source coordination demonstration site, and at the same time performs intelligent updates to the local distribution network. 1) After the distributed photovoltaic site is connected, the power supply capacity of the local distribution network will be enhanced. The unit needs to reduce the input power of the system by 17,600MWh in a year, the system reserve capacity will be reduced by 2.5MVA, and the installed capacity of the spare diesel engine for local users will be reduced by 2MW; 2) Through distribution network intelligence Update, the average fault recovery time was shortened from 1.852s to 1.352s, the fault frequency was reduced from 102 times / year to 57 times / year, and the affe...