System and method for interlocking processes of work ticket and operation ticket based on voice control

A voice control and operation ticket technology, applied in the field of power management, can solve problems such as lack of personnel or multiple people on site, execution of steps out of order, and inability to guarantee sequential execution, etc.

Active Publication Date: 2020-02-18
STATE GRID HEBEI ELECTRIC POWER CO LTD +1
View PDF9 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For example: it may cause problems such as the actual lack of personnel or many people on site, and the operation of undocumented personnel.
[0008] 2. It is impossible to guarantee whether the steps on the work ticket and operation ticket are strictly followed in the correct order during the construction
There may be issues with steps being artificially skipped, missed, or performed out of order
[0009] 3. Even if the correct steps are executed in sequence, since the actual work ticket is in the hands of the person in charge of the work, the control right is only the person in charge of the work, and there is no guarantee that there will be no mistakes or malicious mistakes in the middle
But assuming that this person has the mentality of retaliating against the society, he falsely transmits an order before the power outage, orders to start work, and causes a major accident

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System and method for interlocking processes of work ticket and operation ticket based on voice control
  • System and method for interlocking processes of work ticket and operation ticket based on voice control
  • System and method for interlocking processes of work ticket and operation ticket based on voice control

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0051] like figure 1 As shown, the present invention discloses a system based on voice control interlocking work ticket and operation ticket flow, including a bluetooth earphone used by the operator, a smart phone used by the person in charge of the work, and a computer for The hardware system formed by the tablet computer used by the work licensor and the software system formed by the progress reporting module and scheduling module running on the hardware system.

[0052] The progress reporting module is used to send on-site progress confirmation information to the scheduling module through the first mobile terminal or the second mobile terminal when the current on-site task is completed and the on-site personnel agree to perform the next task.

[0053] The scheduling module is used to receive each on-site progress confirmation information sent by the progress reporting module. When the on-site progress confirmation information of all on-site personnel in the operation ticket...

Embodiment 2

[0058] like figure 2 As shown, the present invention discloses a system based on voice control interlocking work ticket and operation ticket flow, including a bluetooth earphone used by the operator, a smart phone used by the person in charge of the work, and a computer for The hardware system formed by the tablet computer used by the work licensor and the software system formed by the progress reporting module, scheduling module and voiceprint recognition module running on the hardware system.

[0059] The progress reporting module is used to send on-site progress confirmation information to the scheduling module through the first mobile terminal or the second mobile terminal when the current on-site task is completed and the on-site personnel agree to perform the next task.

[0060] The scheduling module is used to receive each on-site progress confirmation information sent by the progress reporting module. When the on-site progress confirmation information of all on-site p...

Embodiment 3

[0067] like image 3 As shown, the present invention discloses a system based on voice control interlocking work ticket and operation ticket flow, including a bluetooth earphone used by the operator, a smart phone used by the person in charge of the work, and a The hardware system formed by the tablet computer used by the work permit, the height sensor embedded and fixed on the Bluetooth headset for identifying the height of the operator, and the height sensor embedded and fixed on the smartphone for identifying the height of the person in charge of the work, and the hardware system running on the hardware The software system formed by the progress reporting module, scheduling module, voiceprint recognition module and altitude reporting module on the system.

[0068] The progress reporting module is used to send the on-site progress confirmation information to the dispatching module through the Bluetooth headset and smart phone when the current on-site task is completed and th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a system and method for interlocking processes of a work ticket and an operation ticket based on voice control, and relates to the technical field of power management. The system comprises a first mobile terminal for use by an operator, a second mobile terminal for use by a work leader, a third mobile terminal for use by a work approver, a progress reporting module and a scheduling module, wherein the progress reporting module is used for field personnel to send field progress confirmation information to the scheduling module through the first mobile terminal or the second mobile terminal; and the scheduling module is used for receiving the field progress confirmation information sent by the progress reporting module and allowing the next scheduling task to be executed when receiving the field progress confirmation information of all the field personnel in the operation ticket. The method comprises a progress reporting step S1 and a scheduling step S2. By meansof the first mobile terminal, the second mobile terminal, the third mobile terminal, the progress reporting module and the scheduling module, the power operation process is effectively controlled.

Description

technical field [0001] The invention relates to the technical field of electric power management, in particular to a system and method for controlling the flow of interlocking work tickets and operation tickets based on voice. Background technique [0002] From the typical cases of violations collected in the power industry in recent years, it can be seen that the proportion of violations caused by work tickets and operation tickets not following the procedures is quite large. Restricted by the previous level of technology, the current work ticket and operation ticket management and control system is still not much different from decades ago. Whether it is handwritten or generated by a computer system, there are many hidden dangers, mainly due to the large human uncertainties. This has resulted in almost every safety accident, which is caused by personnel violations. The reform of work ticket and operation ticket process management is imminent. [0003] From a management ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G10L15/22G10L15/26G10L17/00H04L9/32G01C5/06H04W4/80H04W4/38G08C17/02
CPCG10L15/22H04L9/3231H04W4/80G01C5/06H04W4/38G08C17/02G10L2015/223G10L17/00G10L15/26Y02D30/70
Inventor 杨定衡高娣张志伟刘芃伶任岱光赵钊随超玢马晓曦解晓虹高坤
Owner STATE GRID HEBEI ELECTRIC POWER CO LTD