Road slope measurement method and computer-readable storage medium
A measurement method and technology for road slope, which are used in measurement devices, inclination measurement, mapping and navigation, etc., can solve the problems of slow update frequency of elevation, longitude and latitude, unable to obtain subtle changes in road slope in time, and slow update frequency, etc. The effect of the overall accuracy of the data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] Please refer to Figure 2-6 , Embodiment one of the present invention is: a kind of method for measuring road slope, by installing a set of integrated navigation sensors on the experimental vehicle, driving the experimental vehicle through a road section with a slope, such as a bridge (assuming that the inclination instrument is statically The maximum slope of the bridge deck is measured to be 3 degrees), and the method of joint measurement of elevation-derived slope and pitch angle is used to detect the bridge deck slope in real time.
[0061] Specifically, such as figure 2 As shown, the method includes the following steps:
[0062] S1: According to the elevation information and latitude and longitude information output by the sensor, calculate the elevation-derived slope sequence. Specifically, the elevation information and latitude and longitude information are obtained from the output information of the integrated navigation sensor, and the elevation difference b...
Embodiment 2
[0076] This embodiment is a computer-readable storage medium corresponding to Embodiment 1, on which a computer program is stored, and when the program is executed by a processor, the following steps are implemented:
[0077] According to the elevation information and latitude and longitude information output by the sensor, the elevation-derived slope sequence is calculated;
[0078] According to the attitude angle information output by the sensor, analyze and obtain the pitch angle sequence;
[0079] Calculate and obtain an offset distance sequence according to the elevation-derived slope sequence and pitch angle sequence;
[0080] According to the pitch angle sequence and the offset distance sequence, a joint measurement slope sequence is obtained through calculation.
[0081] Further, according to the elevation information and latitude and longitude information output by the sensor, the calculated elevation-derived slope sequence is specifically:
[0082] Calculate the el...