Constructor monitoring system based on big data and grouping task presetting

A technology for construction personnel and monitoring systems, which is applied to location-based services, closed-circuit television systems, electrical transmission signal systems, etc., can solve the problem of not being able to rule out the abnormal entry of normal workers, the inability to intuitively understand the progress of task execution, and the inability to be intuitive Understand the overall situation of the task group and other issues, to achieve the effect of convenient and quick overall command and dispatch, improve confidentiality measures, and avoid abnormal entry

Inactive Publication Date: 2020-09-15
李建华
View PDF7 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, both the conventional personnel positioning method and the method disclosed in this patent only determine the position of each member, and cannot intuitively understand the progress of their task execution, nor can they intuitively understand the overall situation of each task group, and It cannot be ruled out that normal staff enters abnormally
[0005] In addition, the construction site often has multiple confidential places, and irrelevant personnel are not allowed to enter. At present, security measures such as card swiping, face recognition, and smart locks are generally adopted, so that some people have the authority to open due to work needs
However, at present, these methods cannot avoid the entry of people with opening authority during non-working hours, or the entry of unrelated personnel using work cards, resulting in loopholes in security measures

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Constructor monitoring system based on big data and grouping task presetting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.

[0033] It should be understood that terms such as "having", "comprising" and "including" used herein do not exclude the presence or addition of one or more other elements or combinations thereof.

[0034] Such as figure 1 As shown, the present invention provides a construction personnel monitoring system based on big data and group task preset, which mainly includes:

[0035]Task preset module, which records the personal information of on-site construction personnel as a personnel information database, sets multiple task executors who cooperate to perform the same task as a task group, designates the person in charge of the task group, and presets and records each task group The scheduled task route at the construction site, the scheduled task route includes multiple constru...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a constructor monitoring system based on big data and grouping task presetting. The system mainly comprises a task presetting module used for setting a plurality of task executors which cooperatively execute the same task as a task group and presetting a preset task route of each task group in a construction site, wherein the preset task route comprises a plurality of construction sites arranged according to a time sequence, arrival time, pre-staying time, construction areas and connecting routes of the construction sites ; an identity recognition module used for recognizing personal information of each task executor and determining a task group to which the task executor belongs and a predetermined task route; a positioning and alarming module used for tracking andpositioning the real-time position, recording an actual task route and sending an alarming signal when the actual task route deviates from the preset task route; and a master console used for receiving the alarm signal and independently displaying the positions of the members deviating from the predetermined task route on the display screen.

Description

technical field [0001] The invention relates to the technical field of construction safety, in particular to a construction personnel monitoring system based on big data and group task presets. Background technique [0002] The construction and commissioning site environment of large-scale projects is complex, and multiple on-site construction personnel of various types of work work in different positions. Even a specific task requires multiple people to cooperate. In order to facilitate management, communication and unified scheduling, it is necessary to quickly understand the real-time location and work progress of each person at any time, as well as the progress of each task group, otherwise it may cause one person to affect the entire task group, and one task group to affect the entire project The phenomenon of progress occurs, seriously reducing work efficiency. [0003] At present, on-site construction management is generally reported by supervisors at all levels. For...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G07C1/10H04W4/029G08B21/24G08B7/06G07C9/33G07C9/37G07C9/38H04N7/18
CPCG07C1/10G08B7/06G08B21/24G07C9/33G07C9/37G07C9/38H04N7/181H04W4/029
Inventor 李建华
Owner 李建华
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products