Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Engineering management system and method

A technology for project management and host management, applied in the field of project management, can solve problems such as project management difficulties, on-site supervision is difficult for all workers to supervise, and the construction area is huge, so as to improve project management level, supervise construction progress, and avoid serious safety accidents Effect

Inactive Publication Date: 2020-09-29
FUZHOU COLLEGE OF FOREIGN STUDIES & TRADE
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For large-scale projects, the construction area is huge and due to the large number of workers, once the workers enter the construction site, it is difficult for the on-site supervisor to supervise all the workers, which brings great difficulties to project management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering management system and method
  • Engineering management system and method
  • Engineering management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0029] A project management system comprising:

[0030] hard hat 3, see figure 2 , the safety helmet 3 is equipped with a motion detection device 7, and a pressure sensing device 8 is installed on the inner top of the safety helmet 3. The pressure sensing device 8 in this embodiment is a thin-film pressure sensor. The trigger switch 6 is housed in the buckle 5, and when the connecting buckle 5 is fastened, the trigger switch 6 will be touched. refer to image 3 , the motion detection device 7 in the present embodiment includes a microprocessing module, and also includes an acceleration sensor connected to the microprocessing module, a wireless communication module and a power supply module, the pressure sensing device 8 and the trigger switch 6 are electrically connected to the microprocessing module, and the power supply The module is used to power the entire motion detection device. When the worker is not wearing the safety helmet 3, the motion detection device 7 is in t...

Embodiment 2

[0043] A project management method is characterized in that it comprises the following steps:

[0044] S1. Number the safety helmet 3 of each worker, install an action detection device on the safety helmet 3, match the unique identification code of the detection device with the number of the safety helmet 3, and establish a personal information file for each worker, in the personal information file Enter the worker's identity information, job number information, and job type information in , where the job number information includes the safety helmet 3 number information worn by the worker;

[0045] S2. After the worker wears the safety helmet 3, the motion detection device starts to detect the motion of the worker and outputs motion information;

[0046] S3. Identify and process the action information to identify the source of the action data;

[0047] S4. Analyze and calculate the action data, compare it with the preset conditions, and generate early warning information whe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an engineering management system and method. According to the engineering management system and method, a motion detection device is additionally arranged on the safety helmet,and an RFID label is pasted on the safety helmet. An RFID induction door is arranged on a construction site, after a worker wears the safety helmet, the motion detection device starts to detect the motion state of the worker, when the worker enters and exits the RFID induction door, the RFID label on the safety helmet is inducted and read, label information is uploaded to the management host, andtherefore automatic attendance management can be achieved. In a working process of a worker, the motion detection device uploads detected motion data to the management system; the management system analyzes and calculates the data and sends out early warning information when the motion data is abnormal, so that the working state of workers can be conveniently monitored, the construction progresscan be conveniently supervised, supervisors can be timely reminded when a personal safety event possibly occurs, serious safety accidents are avoided, and the engineering management level is greatly improved by the system.

Description

technical field [0001] The present invention relates to the technical field of engineering management, more specifically, it relates to an engineering management system and method. Background technique [0002] Our country is a big country in infrastructure construction, and a large number of construction projects start every year. Due to the complex situation of workers in construction construction, the quality of workers is uneven, and there are many people who are passive and sabotage. For large-scale projects, the construction area is huge and due to the large number of workers, once the workers enter the construction site, it is difficult for the on-site supervisor to supervise all the workers, which brings great difficulties to project management. Based on the above reasons, it is urgent to design an engineering management system to monitor the working status of workers and improve the level of engineering management. Contents of the invention [0003] In view of t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G06K17/00G07C1/10G07C9/29
CPCG06Q10/063114G06Q10/103G06Q50/08G06K17/0029G07C1/10G07C9/29
Inventor 卓光杰周漩胡泽华
Owner FUZHOU COLLEGE OF FOREIGN STUDIES & TRADE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products