Box structure based on FRP grid and preparation method thereof
A box structure and grid technology, applied in the field of box structure based on FRP grid and its preparation, can solve problems such as short service life, and achieve the effects of improving service life, good durable protection performance, and ensuring bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] The invention discloses a box structure based on FRP grid, please refer to figure 1 and figure 2 . The box structure based on the FRP grid (hereinafter referred to as the box structure) includes: a box body, and the box body includes: an FRP grid forming a box shape, and a protective layer arranged on the outside of the FRP grid 100, a filling layer 200 arranged in the FRP grid and connected to the protection layer 100, and a fireproof crack control layer 300 arranged inside the FRP grid and connected to the filling layer 200.
[0040]In the embodiment of the present invention, the box body may be a quadrangular box or a polygonal box, it should be understood that the present invention is not limited thereto. Wherein, the FRP (fiber reinforced composite material, Fiber Reinforced Polymer, or Fiber Reinforced Plastic, FRP for short) grid is made of reinforced fiber materials, such as glass fiber, carbon fiber, aramid fiber, etc., and the base material is wound, molded...
Embodiment 2
[0057] On the basis of the box structure based on the above-mentioned FRP grid, the present invention also discloses a preparation method of the box structure based on the FRP grid. Specifically, please refer to image 3 , the preparation method comprises:
[0058] S100, fixing the box-shaped FRP grid inside the template 10;
[0059] S200, fixing the filling body 20 in the first accommodation chamber 210;
[0060] S300, pouring a protective layer 100 outside the FRP grid;
[0061] S400, pouring the fire prevention crack control layer 300 in the second accommodation chamber 310;
[0062] S500, removing the filling body 20, and pouring the filling layer 200 in the first accommodation cavity 210;
[0063] In the embodiment of the present invention, please refer to Figure 4 to Figure 8 . Before the manufacturing process of the box structure, first connect a plurality of third grid boxes 600 between the first grid box 400 and the second grid box 500, and set a plurality of fi...
PUM
Property | Measurement | Unit |
---|---|---|
compressive strength | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
elastic modulus | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com