Pumped storage power station inclined shaft tunnel appearance inspection and measurement device and arrangement method
A pumped-storage power station and appearance inspection technology, applied in the field of tunnel inspection, can solve the problems of oxygen content not meeting the standards required by human body, inability to realize inspection well, and inability to complete inspection work, etc., achieving simple structure and strong practicability. , The effect of easy disassembly and assembly
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] The present invention provides a method for arranging appearance inspection and measurement devices for inclined shaft tunnels in pumped storage power stations, such as figure 1As shown, firstly, the measuring trolley 100 is installed in the lower flat tunnel section 700 in the tunnel. The measuring trolley 100 adopts light profiles to reduce the complexity of assembly and improve the installation efficiency. For example, it is made of aluminum alloy. The measuring trolley 100 is in specific During production, the size can be adjusted according to different tunnel diameters to meet the needs of actual inspection. Secondly, install the driving device 200 at a predetermined position outside the mouth of the ventilation shaft 500. The driving device 200 is preferably a hoist; thirdly, according to the running track of the load-bearing rope 400, set guide wheels 300 at the corners of the tunnel wall 600, and the load-bearing rope 400 is preferably used. Steel wire rope, the...
Embodiment 2
[0071] The present invention provides a method for arranging appearance inspection and measurement devices for inclined shaft tunnels in pumped storage power stations, which includes the following steps:
[0072] Firstly, the measuring trolley 100 is installed and assembled in the lower level tunnel section 700 of the tunnel;
[0073] Secondly, fix the winch with a pre-calculated position on the hardened ground outside the 500 ventilation shafts;
[0074] Again, according to the running track of the steel wire rope staked out in advance, a steel wire rope guide wheel 300 is respectively arranged on the upper edge of the 500 ventilation shaft walls and at the turning point at the bottom of the 500 ventilation shafts to complete the steering and transmission of the steel wire rope.
[0075] Finally, four steering trusses of a certain height are set up at the angle and position calculated in advance at the turn of the tunnel, and guide pulleys are set on the steering trusses. The...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com