Medium-voltage power distribution network capacity-to-load ratio calculation method
A calculation method and technology of load capacity ratio, which can be applied in the direction of calculation, electrical components, circuit devices, etc., can solve problems such as the reference range of load capacity ratio of non-medium voltage distribution network, and achieve the effect of improving equipment utilization.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] refer to figure 1 , which is an embodiment of the present invention, provides a method for calculating the capacity-load ratio of a medium-voltage distribution network, including:
[0047] S1: Determine the voltage level or power supply area, and collect the data of the factors affecting the capacity-load ratio of a certain voltage level or power supply area;
[0048] It should be noted that the factors affecting capacity-to-load ratio include load dispersion coefficient, average power factor, transformer load rate, reserve factor, number of public and special distribution transformers in the area, capacity and load rate, and load growth rate.
[0049] Specifically, the capacity-load ratio is generally calculated according to the voltage level, which refers to the ratio of the total capacity of public substation equipment in a certain power supply area and the same voltage level grid to the corresponding grid supply load; the capacity-load ratio is mainly used to evalua...
Embodiment 2
[0086] refer to Figure 2~4 It is another embodiment of the present invention. In order to verify and explain the technical effect adopted in this method, this embodiment is based on the analysis of actual cases from 2015 to 2019, and uses the means of scientific demonstration to verify the real effect of this method. .
[0087] In 2019, 9% of the 10 kV public distribution transformers in Guizhou Province had a load rate of less than 20%, mainly concentrated in rural power grids. The example mainly focuses on the study of the 10 kV capacity-load ratio of rural power grids in Guizhou Province in 2019, taking 70 rural county-level power grids in the province as units (excluding urban power grids), and analyzing and researching from the GDP, population and area within the county-level power supply jurisdiction . According to the sample statistics, the capacity-load ratio of medium pressure is 4.27, and the standard deviation is 1.75.
[0088] The relationship between the capac...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com