Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

197results about How to "Reduce idling" patented technology

Multi-source computing power data integration and intelligent scheduling system and method

The invention provides a multi-source computing power data integration and intelligent scheduling system and method, and the method specifically comprises the steps: building a unified resource abstraction layer, and carrying out the standardized description and virtualized management of multi-source heterogeneous computing resources; real-time acquisition, cleaning and standardized processing of multi-source data are realized; a self-adaptive intelligent scheduling engine is designed, and optimized scheduling is carried out according to historical task data and a real-time system state; an edge-cloud-terminal collaborative computing framework is constructed, and dynamic migration and load balancing of computing tasks are supported; establishing a global performance optimization model, and continuously optimizing the overall performance and the resource utilization rate of the system by utilizing reinforcement learning; security multi-party computing and differential privacy technologies are integrated, and privacy protection of data integration and processing is ensured; an elastic telescoping mechanism is designed, and dynamic adjustment of the system scale and seamless access of novel computing resources are supported. According to the scheme, the utilization rate of computing power resources can be greatly improved, the adaptability and the data processing capacity of the system are enhanced, and more intelligent, flexible and accurate computing power resource management is realized.
Owner:SHENZHEN HUAYI DIGITAL ENERGY CO LTD

Logistics park vehicle path planning method and system

The invention discloses a logistics park vehicle path planning method and system, and the method comprises the steps: obtaining the real-time position and task state information of a vehicle in a park, dynamically constructing a vehicle path planning network model, dividing a road into nodes and edges, and forming a directed weighted graph; according to the directed weighted graph, an improved multi-lane algorithm is adopted, the path length, the congestion degree and the vehicle characteristic factors are comprehensively considered, and the optimal path of each vehicle is calculated; for the optimal path, introducing a virtual lane and a time dimension, pre-judging occupation conditions of multiple vehicles on the virtual lane for each time slice, and constructing a conflict constraint matrix; obtaining park high-precision map data, extracting road network topology, lane lines and traffic sign marking elements, performing lane-level refinement on the optimal path, and generating a driving track; and through a multi-sensor fusion positioning technology, obtaining high-precision position and attitude information of the vehicle, matching the high-precision position and attitude information with the driving track, and calculating a track tracking error.
Owner:SHENZHEN ZHIHUI QICE TECH CO LTD

AGV task allocation method and system

The invention discloses an AGV task allocation method and system, and relates to the technical field of automatic navigation trucks, and the method comprises the steps: carrying out the initialization of AGV state information; acquiring environment information in real time through ground sensor equipment; performing priority evaluation on the task instructions, and adjusting task priorities in real time according to emergencies; task merging and splitting are carried out; task allocation is carried out by using an ant colony algorithm, and a task allocation result is output to the corresponding AGV to guide the AGV to execute operation according to the allocated task; an optimal path is planned for each AGV, and path planning is dynamically adjusted in the task execution process of the AGVs; and optimizing a task allocation algorithm by adjusting a pheromone volatilization coefficient. Limited AGV resources are reasonably scheduled by arranging a task instruction obtaining module, a task information processing module and a task planning and distributing module, high environment perception and adaptability are achieved, and task priorities and path planning can be rapidly adjusted.
Owner:SHENZHEN EGO ROBOT CO LTD

Intelligent production management method and system for pharmaceutical workshop

The invention discloses an intelligent production management method and system for a pharmaceutical workshop, and relates to the technical field of pharmaceutical production, and the system achieves the intelligent optimization of a production plan, material flow and inventory management through three core modules. The production plan intelligent scheduling module dynamically adjusts the production plan by calculating a first scheduling coefficient Ddxs1 and a second scheduling coefficient Ddxs2; the material flow and equipment state association module monitors the supply speed, the circulation path and the equipment state in real time, so that coordination and consistency of material flow and equipment operation are ensured, and the production efficiency is optimized; the inventory early warning and supplement mechanism module dynamically monitors the inventory state by calculating the first inventory coefficient Kcxs1 and the second inventory coefficient Kcxs2, and timely adjusts the strategy when the inventory is insufficient or overstocked, thereby ensuring the production stability and the rationality of the inventory structure, and improving the refinement level of inventory management.
Owner:NANTONG HENGLUNTONG TECHNOLOGY CO LTD

Game theory-based improved model cloud computing node storage, calculation and training resource competition scheduling method

The invention discloses a game theory improved model-based cloud computing node storage calculation training resource competition scheduling method. The method comprises the following steps of S1, constructing a global resource scheduling system; s2, carrying out initial division on the cloud computing nodes in each logic partition; s3, executing a local resource competition game model; s4, the global resource scheduling system collects a local resource competition result of each logic partition and residual available resources in each logic partition; s5, executing the global collaborative game model; s6, dynamically updating the resource state information of the cloud computing node; s7, the global resource scheduling system performs adaptive adjustment on resource demand strategies in the local game model and the global cooperative game model; and S8, the global resource scheduling system stores and analyzes past resource competition results and task execution conditions, and each cloud computing node updates a resource demand strategy according to the data. According to the invention, the problems of resource bottleneck and overload in the prior art are solved, and the resource utilization efficiency and the scheduling flexibility are greatly improved.
Owner:HUNAN UNIV OF SCI & ENG

Intelligent management method and management system for automobile die production

The invention discloses an intelligent management method and management system for automobile die production, and relates to the technical field of intelligent management. During operation of the system, temperature, pressure, die state and machining parameter data are collected in real time through sensors installed at all positions of a production line, related data are obtained, and cleaning and preprocessing are carried out; an intelligent management index Mjsc is obtained after calculation, quality parameters in the mold production process are monitored in real time through online detection equipment on the basis of a data analysis result, defects occurring in the production process are automatically recognized and classified by utilizing machine vision and artificial intelligence technologies, and the production efficiency is improved. The intelligent management index Mjsc is compared with a preset qualified threshold value M and a preset qualified threshold value N, quality data in the production process are analyzed, the quality level is evaluated, cost prediction and budgeting are carried out based on historical data and a production plan, and feedback information is collected from links of a production line, quality control and cost management.
Owner:丹阳鸣升机械制造有限公司

Distributed intelligent production scheduling decision-making system based on cloud computing

The invention relates to the technical field of production scheduling of manufacturing workshops, in particular to a distributed intelligent production scheduling decision-making system based on cloud computing. The system is composed of a cloud computing platform, a data acquisition module, a data processing module, an intelligent production scheduling engine and a distributed execution control module. The problems of performance bottleneck, data acquisition limitation, lack of flexibility and adaptability of a production scheduling scheme and the like in a traditional production scheduling system are solved, intelligent distribution and scheduling of production tasks can be realized through fusion application of advanced technologies such as cloud computing, big data and artificial intelligence, the production efficiency and the product quality are improved, and the production cost is reduced. And greater economic benefits and social benefits are created for enterprises.
Owner:SUZHOU CHANGSIYUAN INTELLIGENT TECHNOLOGY CO LTD

Freight scheduling information management method and system and storage medium

The invention relates to the technical field of freight scheduling, in particular to a freight scheduling information management method and system and a storage medium. The method comprises the following steps that uncompleted order collection is carried out on a freight platform to obtain an uncompleted order set, and the uncompleted order set comprises a plurality of uncompleted orders; each uncompleted order at least comprises an order ID, order release time, target cargo attribute data, publisher identity data, a departure place, a destination, an order state identifier, an order transportation task schedule, cargo stacking attributes, predicted delivery time and cargo expected arrival time; and performing order state classification and marking on the uncompleted order set to obtain a classified order set. By optimizing the loading space utilization rate of the vehicle, the unloaded and half-loaded conditions of the vehicle can be reduced, so that the fuel consumption and the transportation cost are reduced.
Owner:万联易达物流科技有限公司

Intelligent vehicle dispatching system for intelligent supply chain logistics

The invention relates to the technical field of logistics, and discloses an intelligent supply chain logistics intelligent vehicle scheduling system which is composed of a vehicle positioning tracking module, a dynamic scheduling and path optimization module, a loading and unloading management module, a shift management module and a feedback early warning module. According to the invention, through dynamic updating of the vehicle position, the system adjusts the vehicle scheduling strategy in real time to cope with changes of logistics demands and changes of road conditions, and according to the real-time logistics demands and road conditions, vehicle scheduling and path planning are optimized, so that the transportation efficiency is improved, vehicle empty driving and cargo accumulation are reduced, and the transportation cost is reduced. Through the target function # imgabs0 #, vehicle scheduling and path selection are optimized, the transportation cost is reduced, and the beneficial effect of scheduling logistics vehicles to avoid cargo accumulation under the condition that logistics rises greatly is achieved.
Owner:杜宇清

Intercity cargo splicing transportation path optimization algorithm based on large model optimization

The invention relates to the technical field of inter-city cargo splicing and loading, in particular to an inter-city cargo splicing and loading transportation path optimization algorithm based on large model optimization, and solves the problems that in the prior art, an optimization algorithm based on a large model generally relates to a complex calculation process and needs a large amount of calculation resources and time, and especially in a real-time path planning scene, the calculation process is complicated. And the calculation delay can influence the transportation efficiency. The invention discloses an inter-city cargo splicing transportation path optimization algorithm based on large model optimization. The algorithm comprises data collection and preprocessing, model construction and training, algorithm optimization and verification, path optimization calculation, result evaluation and feedback, and algorithm deployment and application. According to the method, various possible transportation paths are analyzed and compared through an algorithm, the optimal path is selected, unnecessary detour and waiting time is reduced, so that the transportation efficiency is improved, and the algorithm can perform intelligent scheduling and reasonable arrangement of transportation vehicles and routes according to real-time traffic conditions, cargo demands, vehicle states and other information.
Owner:JIANGSU KUAIERJIE LOGISTICS CO LTD

Intelligent management system and method for charging equipment

PendingCN119151262AAdjust allocation strategyRealize managementForecastingState of chargeIntelligent management
The invention relates to the technical field of charging equipment management, and discloses a charging equipment intelligent management system and method, and the specific steps are as follows: constructing an intelligent management system comprising a charging station information unit, a charging equipment information unit and a user information unit, setting a charging equipment recommendation platform, and recommending a nearby charging station to a user. The method comprises the following steps: recording a search event of a user, collecting position information of a charging station, a use state of charging equipment and electric quantity data, dividing a monitoring area and monitoring search points to identify peak and low peak time periods, and executing a charging equipment supplement strategy and a charging station matching strategy to optimize distribution of the charging equipment and charging selection of the user. The method comprises the following steps: collecting search points of each monitoring area in a monitoring time period, executing a charging equipment supplement strategy, and in addition, executing a charging station matching strategy by a system according to personal information data collected in a peak time period.
Owner:SUICHONGCHONG (SHANGHAI) INTELLIGENT TECHNOLOGY CO LTD

Universal zk-SNARK zero-knowledge proof optimization system and method

The invention discloses a universal zk-SNARK zero knowledge proof optimization system and a universal zk-SNARK zero knowledge proof optimization method. The system comprises a trusted device, a certifier and a verifier, the certifier realizes multi-scalar multiplication by using a bucket algorithm, the certifier comprises a split window unit, an in-bucket point protocol unit, an in-window protocol unit and a window aggregation unit, the split window unit splits the multi-scalar multiplication into a plurality of subtasks based on a set window, and the in-window protocol unit is used for aggregating the subtasks. The window is dynamically set according to the Montgomery modular multiplication calculation amount; the in-bucket point specification unit stipulates points on each elliptic curve finite field to a bucket to obtain a result of each subtask; the in-window reduction unit is used for carrying out point multiplication on the bucket numbers and the reduced buckets and accumulating and reducing the buckets in the same window into one bucket to obtain the window value of each window; and the window aggregation unit obtains a calculation result of multi-scalar multiplication based on the window value of each window. According to the method, the execution efficiency of the multi-scalar multiplication is effectively optimized, and the efficient operation of the zk-SNARK proof generation process is favorably realized.
Owner:SHENZHEN INST OF ADVANCED TECH CHINESE ACAD OF SCI

Intelligent scheduling method based on port bulk cargo operation

The invention discloses an intelligent scheduling method based on port bulk cargo transfer. The method comprises the steps of S1, obtaining related information of bulk cargos to be transferred and related information of transport vehicles; s2, matching transport vehicles of corresponding types; s3, calculating a transfer train number; s4, calculating the number of transport vehicles; when the number of the transport vehicles is one, executing the step S5; when the number of the transport vehicles is two or more than two, executing the step S6; s5, generating transfer scheduling planning information according to the loading position of the bulk cargo to be transferred and the departure position of the corresponding transport vehicle; s6, determining the departure sequence of the transport vehicles: for the first departure transport vehicle, calculating corresponding transfer scheduling planning information based on the step S5; and for the second transport vehicle and the subsequent departure transport vehicle, corresponding transfer scheduling planning information is generated according to the transfer scheduling planning information of the previous transport vehicle. According to the invention, the accuracy, orderliness and collaboration of bulk cargo transfer scheduling can be improved.
Owner:CHONGQING TIANCHENG DIGITAL TECH CO LTD

Model reasoning method and device, electronic equipment and storage medium

The invention provides a model reasoning method and device, electronic equipment and a storage medium. The method comprises the following steps: segmenting input data into a plurality of sub-data; on the basis of a first calculation node applied in model reasoning, calculating the multiple pieces of sub-data to obtain a first calculation result of each piece of sub-data; based on the first communication node, performing communication processing on the first calculation result of one piece of sub-data so as to transmit the first calculation result to the second calculation node for calculation, and when the first communication result is calculated based on the second calculation node, performing communication processing on the first calculation result of the next piece of sub-data based on the first communication node; the second computing node and the first communication node are deployed in different hardware resources. According to the method, the device, the electronic equipment and the storage medium provided by the invention, communication and calculation are carried out in parallel, so that most of consumed time of communication operation can be hidden by consumed time of calculation, the situation that calculation nodes are idle is reduced as much as possible, and then the model reasoning efficiency is effectively improved.
Owner:SHANGHAI BIREN TECH CO LTD

SARIMA-RF combined model-based driving vehicle number prediction method, system, device, medium and program

The invention discloses a running vehicle number prediction method, system, device, medium and program based on an SARIMA-RF combined model, and belongs to the technical field of railway freight volume prediction. The method comprises the following steps: acquiring the monthly data of the running condition of a railway international combined transport train to form a train running condition monthly data set; utilizing an SARIMA model to fit a running vehicle number sequence in the monthly data set of the running condition of the class, and obtaining a predicted value sequence and a residual sequence; fitting the residual error sequence by using an RF model to obtain a prediction result; and combining the predicted value sequence of the SARIMA model with the prediction result of the RF model to obtain a final prediction result of the SARIMA-RF combined model. According to the method, the accuracy of the prediction result of the running number of the international railway intermodal trains is improved, and the running uncertainty of railway transportation and the running uncertainty of the international railway intermodal trains are reduced.
Owner:CHINA RAILWAY XIAN GRP CO LTD

Unmanned aerial vehicle arrival and departure sorting method based on FCFS algorithm and reinforcement learning

The invention discloses an unmanned aerial vehicle arrival and departure sorting method based on an FCFS algorithm and reinforcement learning, and the method comprises the steps: enabling an unmanned aerial vehicle to enter a waiting layer of a terminal region, creating an initial execution time table, and obtaining the initial data of the unmanned aerial vehicle; obtaining an initial state matrix; determining a to-be-executed action set of the unmanned aerial vehicle based on the airport operation limiting condition; calculating a reward value of each to-be-executed action in the to-be-executed action set; the unmanned aerial vehicle executes the to-be-executed action with the maximum reward value; repeating the above steps until the accumulated reward value is maximum, and obtaining the sequence of the to-be-executed actions corresponding to the accumulated reward value; optimizing the optimal time execution table based on the sorting of the actions to be executed and the sorting result of the FCFS algorithm; and the unmanned aerial vehicle executes corresponding actions according to the optimal time execution table. According to the optimized take-off and landing sequence, the utilization rate of the take-off and landing channels can be effectively improved, the situation that the take-off and landing channels are idle or congested is reduced, and the safety risk caused by collision of the unmanned aerial vehicles is reduced to a great extent.
Owner:NANTONG UNIV

Online car-hailing fee scheduling method based on supply and demand prediction and storage medium

The invention discloses an online car-hailing fee scheduling method based on supply and demand prediction and a storage medium. The invention relates to the technical field of online car hailing. Passenger request data including driver positioning information 1, weather forecast API information w, traffic flow data f and event calendar e are integrated to form a data set D; useful numeric features are screened out from the data set D, and comprise the thermodynamic levels of a departure place and a destination, weather classification codes and time sequence features; and the local space extractor processes geographical distribution data of a departure place and a destination by using a CNN, extracts a feature map in combination with GIS data, and carries out training to obtain local space correlation A of the online car-hailing demand. A model integrating the CNN, a dynamic selection regression model (gradient boosting tree) and global correlation analysis is adopted, and the online car-hailing demand is obtained. Therefore, the supply and demand conditions of online car-hailing can be predicted precisely. According to the method, the influence of local space, a time sequence and global factors on supply and demand can be captured, and the prediction accuracy and adaptability are improved.
Owner:BEIJING BAILONG MAYUN TECH CO LTD

Integrated double-channel control system for numerical control system

The invention discloses an integrated dual-channel control system for a numerical control system, which belongs to the technical field of numerical control dual-channel control systems, and comprises a resource monitoring module, a resource distribution module, a parameter acquisition module, a channel synchronous feedback module and a control module, and the resource monitoring module, the resource distribution module and the control module are in communication connection in sequence. The parameter acquisition module, the channel synchronization feedback module and the control module are in communication connection in sequence, the resource monitoring module is used for monitoring resources including processor utilization rate and memory occupation, and the resource distribution module is used for dynamically distributing resources and adjusting a dual-channel resource distribution strategy according to a real-time running state of a system; according to the integrated dual-channel control system for the numerical control system, resources are allocated, so that dual-channel response is quicker. And meanwhile, when the problem of channel asynchronization can be rapidly solved, the system is more stable, and follow-up machining is facilitated.
Owner:HUAZHONG CNC (NANJING) RES INST CO LTD

Radiology department equipment intelligent management system and method based on digital twinborn technology

PendingCN119108086AReal-time monitoring of key parametersReal-time monitoring levelHealthcare resources and facilitiesMedical equipmentEarly warning systemData acquisition
The invention discloses a radiology department equipment intelligent management system and method based on a digital twinborn technology. The system comprises a data acquisition module, a digital twinborn model construction module, a core processing module and a user interaction module. The method comprises the steps of S1, data acquisition, S2, digital twin model construction, S3, real-time monitoring and early warning, S4, remote monitoring and maintenance, S5, data analysis and optimization, and S6, benefit analysis. Through the digital twinborn technology, the system can monitor various key parameters of radiology department equipment in real time, such as liquid nitrogen level, bulb tube thermal capacity and the like, and gives out early warning immediately when the parameters are abnormal; compared with traditional manual inspection, the early warning system can accurately give out early warning 30 minutes before a fault occurs, and the timeliness and accuracy of early warning are greatly improved; and the early warning system reduces the occurrence of sudden faults, so that the emergency maintenance cost is reduced.
Owner:SOUTH CHINA HOSPITAL OF SHENZHEN UNIVERSITY

Self-adaptive traffic prediction and dynamic network optimization system

The invention discloses a self-adaptive traffic prediction and dynamic network optimization system, and relates to the technical field of automatic management of cloud computing networks. Comprising the following steps: step 1: carrying out data collection and processing, step 2: carrying out model training and constructing a prediction engine by utilizing a traffic prediction model, step 3: carrying out real-time monitoring and prediction, and step 4: dynamically adjusting a routing table and optimizing a routing path by utilizing a routing optimization algorithm according to predicted traffic data. The method comprises the following steps of: (1) predicting traffic data, dynamically distributing network loads to different servers or nodes according to the predicted traffic data by utilizing a load balancing algorithm to balance resource use, (5) carrying out decision support and automation: providing decision support, recommending configuration change and automatically executing the configuration change when necessary, and (6) carrying out feedback and iteration: continuously collecting effect data after execution, and performing iterative optimization on the flow prediction model fed back to the prediction engine.
Owner:SHANDONG LANGCHAO YUNTOU INFORMATION TECH CO LTD

Intelligent coal mine vehicle dispatching control method based on position feedback

The invention belongs to the technical field of coal mine vehicle dispatching control, and particularly relates to an intelligent dispatching control method based on position feedback. Firstly, position information is collected through multiple positioning technologies, and high-precision position feedback control is achieved through an improved Kalman filtering algorithm. And dynamically adjusting a vehicle driving path and a task allocation strategy based on an improved reinforcement learning algorithm. And then a scheduling instruction is issued through a wireless communication network, and monitoring optimization is carried out. And finally, vehicle faults and emergencies are detected, and emergency control including fault isolation and path re-planning is automatically executed. According to the method, the positioning precision is improved through the multi-modal sensor, and the limitation of a single sensor is overcome. An improved reinforcement learning algorithm improves scheduling efficiency, emergency control guarantees production continuity and safety, and many problems of a traditional coal mine vehicle scheduling method are effectively solved.
Owner:陕西智引科技有限公司

Unmanned aerial vehicle equipment access management and scheduling method

The invention discloses an unmanned aerial vehicle equipment access management and scheduling method, and relates to the technical field of cloud computing and big data. Comprising the following steps: step 1, creating a standardized access interface of unmanned aerial vehicle equipment; 2, collecting data in real time in the task execution process of the unmanned aerial vehicle equipment, preprocessing the collected data, comprehensively processing the preprocessed data from different unmanned aerial vehicle equipment by adopting a data fusion algorithm, and generating a state model of the unmanned aerial vehicle equipment; the method comprises the steps of 1, analyzing current available unmanned aerial vehicle equipment based on a state model by using an optimization algorithm, and dynamically adjusting resource allocation of the unmanned aerial vehicle equipment to execute a corresponding task, 4, monitoring execution state information of the unmanned aerial vehicle equipment in real time and obtaining feedback information, and 5, after the task is completed, evaluating and analyzing the unmanned aerial vehicle equipment and generating a task report.
Owner:INSPUR QILU SOFTWARE IND

Distributed computing system based on pre-scheduling resource collaborative adaptation

The invention provides a distributed computing system based on pre-scheduling resource collaborative adaptation, and relates to the technical field of resource collaborative allocation systems. The distributed computing system based on pre-scheduling resource collaborative adaptation aims at solving the problems that in the prior art, resource scheduling is not flexible, and application configuration and resource scheduling are lack of coordination. By introducing a dynamic scheduling mechanism of the resources, organic combination of resource pre-scheduling and flexible allocation is realized. Meanwhile, through cooperation of application configuration and resource scheduling, optimal distribution and execution of calculation tasks are achieved, the system is composed of a server side and a client side, the client side has pre-scheduling resources and is used for feeding back the resource state in real time and receiving and executing the calculation tasks, and the server side is responsible for monitoring and scheduling of global resources and task distribution. And through a designed heuristic collaborative adaptation algorithm, the server can dynamically schedule resources in the pre-scheduling resources, and high efficiency and stability of task execution are ensured.
Owner:FUDAN UNIVERSITY

Warehouse logistics scheduling system and method based on big data analysis

The invention discloses a warehouse logistics scheduling system and method based on big data analysis, relates to the technical field of logistics scheduling, and solves the problems of lack of accuracy of personnel scheduling and serious resource waste of a traditional logistics scheduling system. The system can perform personnel allocation based on the emergency degree of the order, the order quantity and the arrival time of the vehicle; by calculating the arrival time, the order quantity and the emergency order proportion of each vehicle, the system can reasonably arrange workers to carry out unloading operation according to the priorities of different vehicles; the mode based on big data analysis not only can ensure that the emergency order is processed in time, but also can avoid excessive scheduling and reduce the waste of human resources; compared with a traditional mode of arranging workers through experience or simple pre-estimation, the automatic scheduling mode has the advantages that the accuracy of personnel scheduling is remarkably improved, and idle workers or overload work caused by improper scheduling is reduced.
Owner:BEIJING XUNBANG RUNZE LOGISTICS CO LTD

Capacity elastic scaling method and related device

The invention relates to the technical field of computers, and provides a capacity elastic scaling method and a related device, which are used for storing the resource utilization rate, and the method comprises the following steps that: a main node respectively matches the measurement information of each logic storage unit in a cluster with a scaling rule set associated with each storage logic unit, and when the matching succeeds, the scaling rule set of each storage logic unit is matched with the measurement information of each logic storage unit; and adjusting the storage capacity of the corresponding logic storage unit according to the target capacity contained in the matched target scaling rule. According to the measurement data of the logic storage unit, the capacity of the logic storage unit is elastically expanded and contracted.
Owner:TENCENT TECHNOLOGY (SHENZHEN) CO LTD

Multi-angle adjusting circular swinging screening machine

The utility model relates to the technical field of screening machines, and particularly discloses a multi-angle adjusting circular swinging screening machine which comprises a base, vibration supporting columns fixedly installed on the surface of the base at equal intervals, a vibration base fixedly installed on the tops of the vibration supporting columns, a screening frame placed on the upper surface of the vibration base and a driving motor fixedly installed in the center of the interior of the vibration base. And a lower eccentric block is fixedly mounted at one output end of the driving motor. By arranging the positioning gear ring capable of sliding up and down, the interior of the sealing cavity can be in a negative pressure state by pressing the sliding rod, the positioning gear ring is driven by the sealing block and the connecting rod to slide upwards, and when the positioning gear ring is not meshed with the rotating gear ring, the angle of the upper eccentric block can be freely rotated; the amplitude during working can be adjusted by adjusting the included angle between the upper eccentric block and the lower eccentric block, and the mode of quickly changing the angle does not need to use tools, so that the adjusting time is saved, and the working efficiency is improved.
Owner:SHANDONG JINHENG PLASTIC CO LTD

Intelligent logistics park vehicle scheduling optimization system

The invention discloses an intelligent logistics park vehicle scheduling optimization system. The system comprises a vehicle positioning module, a data analysis module, a monitoring module, a vehicle scheduling optimization module and a communication module. The vehicle positioning module is used for acquiring position information of each vehicle in the intelligent logistics park in real time; the data analysis module is used for analyzing the position information of the vehicle in real time to obtain a vehicle scheduling plan; the monitoring module is used for monitoring the running state of vehicles in the intelligent logistics park in real time; the vehicle scheduling optimization module is used for carrying out scheduling optimization on the vehicles in the intelligent logistics park according to the vehicle scheduling plan and the running states of the vehicles; and the communication module is used for connecting communication equipment between the intelligent logistics park vehicle management system and the vehicle to realize real-time instruction transmission and vehicle information feedback. According to the invention, the efficiency and accuracy of logistics park vehicle management and scheduling can be improved, and a better traffic safety guarantee is provided.
Owner:SHENZHEN ZHIHUI QICE TECH CO LTD

Orthopedic treatment data analysis method and system

The invention relates to the technical field of medical data analysis, in particular to an orthopedic treatment data analysis method and system, and the method comprises the following steps: analyzing demand data based on operation data, evaluating heterogeneous computing resources, enabling the processing capability and the response time to correspond to the analysis demands of operation time and rehabilitation progress data, and obtaining an analysis result; and determining the dependency degree of multiple tasks on the computing resources, and generating a resource demand matching table. According to the method, the heterogeneous computing resources are evaluated to match operation time and rehabilitation progress data requirements, the resources are accurately configured, each task can be matched with the optimal computing resource, the resource utilization rate and the data processing efficiency are improved, the task execution sequence and the resource utilization are dynamically optimized, resource vacancy and task delay are reduced, and the operation efficiency is improved. The response speed and accuracy of data processing are improved, the performance of differentiated resources is monitored and analyzed in real time, key resources are effectively identified and reconfigured, the flexibility and expandability of data processing are enhanced, and the high efficiency of orthopedic data analysis is ensured.
Owner:THE FIRST PEOPLES HOSPITAL OF NANTONG

System and method of intelligent logistics platform linked with steel plant

The invention provides an AI-based intelligent logistics platform vehicle rear service and iron and steel plant linkage system and method, and aims to improve the system and the method through an innovative adaptive learning optimization algorithm, a multi-modal data fusion technology, an intelligent contract and block chain technology, an environment perception and adaptive adjustment mechanism and augmented reality (AR) auxiliary operation. And high-efficiency intelligent management of logistics transportation and after-vehicle service is realized. The system optimizes transportation routes and resource allocation through real-time acquisition and deep analysis of steel plant production data, logistics information and market demands, and provides personalized vehicle maintenance suggestions and customer services at the same time. The block chain technology is utilized to ensure the data security and transparency, and the augmented reality technology improves the operation efficiency and security. In addition, the system can automatically adjust transportation and maintenance strategies according to environmental changes, reduces environmental influences, improves the overall operation efficiency and market competitiveness, and brings a new opportunity of environmental protection and sustainable development to the heavy industry fields such as steel plants and the like.
Owner:FUJIAN MINGUANG CLOUD BUSINESS CO LTD

Desilting device and method based on water conservancy project

The invention discloses a desilting device and method based on a water conservancy project, and belongs to the technical field of water conservancy project equipment. Comprising a movable ship body, a dredging mechanism, a first pipeline mechanism, a second pipeline mechanism, a negative pressure assembly and a sludge storage box. The desilting mechanism comprises a rotating assembly and a desilting assembly arranged at the output end of the rotating assembly. The dredging assembly comprises a sludge input end and a sludge output end; the first pipeline mechanism is communicated with the sludge output end; the second pipeline mechanism is communicated with the output end of the first pipeline mechanism; the negative pressure assembly is communicated with the second pipeline mechanism; and the sludge storage box is arranged on the ship body. The movable ship body can flexibly shuttle in rivers and lakes, and large-area and all-around cleaning is achieved; and the desilting mechanism crushes the sludge into smaller particles or fragments, so that the sludge suction efficiency is remarkably improved, and the sludge is more easily sucked up.
Owner:中交(苏州)城市开发建设有限公司 +2