Model prediction control method of voltage source type rectifier when network voltage is unbalanced

The invention belongs to the field of power converter control and relates to a model prediction control method of a voltage source type rectifier when a network voltage is unbalanced. The model prediction control method of the voltage source type rectifier when the network voltage is unbalanced comprises the steps of converting three-phase network voltage and a three-phase current into network voltage and a current which are under a two-phase static coordinate system through an abc / alpha beta coordinate, obtaining network positive sequence voltage and negative sequence voltage by carrying positive and negative sequence component separation of the network voltage under the two-phase static coordinate system, calculating reference values of active power, calculating current reference values of the rectifier under the two-phase static coordinate system, and carrying out model prediction current control and selecting an optimal on-off state. The model prediction control method of the voltage source type rectifier when the network voltage is unbalanced is capable of quickly and precisely tracing the current under the two-phase static coordinate and effectively eliminating fluctuation of direct current side voltage at the same time, power quality of the system is improved, a reliable network-connected operation of the rectifier when transient state network voltage is unbalance is achieved, and dynamics and stability of the whole system are improved.
Owner:TIANJIN UNIV

Cloud system structure pre-warning system and method for riverway type reservoir tributary bay water bloom

ActiveCN103678910AEasy to operateRealize random cloud storage of big dataSpecial data processing applicationsCloud storageWarning system
The invention relates to a cloud system structure pre-warning system and method for riverway type reservoir tributary bay water bloom. The cloud system structure pre-warning system comprises a monitoring cloud module, an information cloud module, an application supporting module, a water bloom pre-warning module and a discussion decision-making module. The monitoring cloud module is composed of a field information collecting unit and an operation communication unit, storage media of the information cloud module are composed of movable distributed storage station nets combined fixedly, the application supporting module is composed of a basic supporting unit, an application customization unit, a data cooperation unit and an emergency response module, the water bloom pre-warning module is composed of a risk analysis unit and a pre-warning and forecasting unit, and the discussion decision-making module is used for achieving decision-making discussion and information sharing communication in a cloud environment. The cloud system structure pre-warning system and method for riverway type reservoir tributary bay water bloom achieve seamless linkage and operation control over the modules based on a cloud system structure, carry out all-weather monitoring, cloud storage and water bloom risk pre-warning on the inducing factors of the riverway type reservoir tributary bay water bloom and water bloom biochemical properties, and provide a new measure based on the cloud system structure for preventing and reducing water bloom events.
Owner:CHINA THREE GORGES CORPORATION +1

Cell information detection and cell coverage calibration method for mobile network

ActiveCN105744535AAvoid time delays and human errorsDelay the time of being blockedNetwork planningTime delaysMobile Web
The invention discloses a cell information detection and cell coverage calibration method for a mobile network, belongs to the field of mobile communication, and solves the problems that how to accurately acquire the cell key parameters of the mobile network and thereby to establish a base station information list, and how to accurately measure and calibrate the actual coverage range of each cell. According to the method, the user online information of the mobile network collected by a user terminal is used, and via the big data analysis means, the cell key parameters (cell identifiers, station location longitudes and latitudes, direction angles, station types, etc.) are determined, and the base station information list is established; and based on a large number of sampling data of the user online information collected by the terminal, the coverage boundary of each cell is accurately calibrated, and the cell coverage map of the whole network is established. According to the method, the cell key parameters of the mobile network can be accurately acquired, and thereby the base station information list can be established, the time delay and manual errors caused by maintaining the base station information list in a traditional manual collecting and step-by-step reporting manner can be effectively avoided, and the actual coverage range of the network can be accurately evaluated.
Owner:BEIJING UNION UNIVERSITY

Extensible offline UPS power supply

The invention discloses an extensible offline UPS power supply, which comprises a power supply body, wherein a primary power supply is arranged inside the power supply body, an extension power supplyis arranged at the bottom part of the primary power supply, a primary input electric wire and a primary output electric wire are arranged on the rear side of the primary power supply, the rear side ofthe extension power supply is provided with a secondary input electric wire and a secondary output electric wire, a single chip microcomputer is arranged on the top part of the primary power supply,an input end of the single chip microcomputer is provided with a coulombmeter and a circuit acquisition unit, an output end of the single chip microcomputer is provided with an alarm unit and a circuit control module, and a connecting end of the single chip microcomputer is provided with a data processing module and an information acquisition module. The information acquisition module logs into aState Grid platform via a network and acquires a power outage notification from the State Grid platform, the circuit control module controls the primary power source and the extension power supply tosupply power to loads in power outage timely, so as to avoid the delay time of switching power-on circuits, the single chip microcomputer further transmits information to the alarm unit, and the alarmunit can transmit alarm information to a mobile phone and a computer, so that the staff can back up quickly.
Owner:佛山市众盈电子有限公司

Prophet combination model-based monitoring time sequence data prediction method

The invention discloses a monitoring time sequence data prediction method based on a Prophet combination model, and relates to the technical field of engineering construction and operation and maintenance. Comprising the following steps: S1, arranging a sensor on an engineering site to obtain original time sequence data X0 = {x01, x02,..., x0i,..., x0n}, and marking festivals and holidays for interference time sequence data; s2, constructing a Prophet combination model, substituting original time sequence data X0 into a data preprocessing layer of the Prophet combination model, and performing iterative calculation to obtain time sequence data X '= {x' 1, x '2,..., x'i,..., x'n} after the gross error is deleted; the method comprises the steps of (S1) obtaining a Prophet combination model prediction layer, (S2) obtaining a Prophet combination model prediction layer, (S3) substituting X'into the Prophet combination model regression layer, and carrying out regression vacancy calculation to obtain complete time sequence data Y '= {y' 1, y '2,..., y'i,..., y'n}, and (S4) substituting the complete time sequence data Y' into the Prophet combination model prediction layer to obtain predicted time sequence data Z '= {z'n-k + 1, z'n-k + 2,..., z'n}. According to the method, the anti-interference performance of a prediction model is enhanced, and the prediction accuracy is improved.
Owner:SOUTHWEST JIAOTONG UNIV

Device and method for measuring thermal resistance of nucleating layer of gallium nitride device based on picosecond laser

The invention discloses a device and a method for measuring thermal resistance of a nucleating layer of a gallium nitride device based on picosecond laser. The device mainly comprises a heating and power measurement subsystem, a transient thermal response measurement subsystem, and a measurement guarantee subsystem, wherein the heating and power measurement subsystem comprises a picosecond laser heating module, an electrical heating module, and an electrical temperature detection module. The method adopts a structure function method to calculate the layered thermal resistance. The method comprises a picosecond laser heating step and an electrical heating step, wherein picosecond laser is used for heating a semiconductor device thin layer at first, then, an electrical acquisition mode is adopted for temperature measurement, and electrical heating and electrical detection modes are adopted for determining equivalent electrical heating power of laser heating. The problem that the thermal resistance of the nucleating layer of a gallium nitride HEMT device cannot be tested under the micrometer scale in the prior art is solved. A voltage and temperature calibration curve interpolation calculation mode is adopted, and the influence of parameter nonlinearity is avoided.
Owner:CHINA ELECTRONICS STANDARDIZATION INST

An anti-stealing system

ActiveCN103293354BDetection conversion efficiencyTimely replacementTime integral measurementElectricityPower cable
The invention relates to an electricity larceny prevention system. The electricity larceny prevention system is mainly technically characterized by comprising first electronic transformers, second electronic transformers, a line monitoring terminal, and a remote data center; the first electronic transformers are mounted on a power cable between a high-voltage line and a transformer, and the second electronic transformers are mounted on a power cable between the transformer and a user's electricity meter; the electronic transformers are connected with the line monitoring terminal in a wired or wireless manner, the line monitoring terminal is connected with the remote data center in a wired or wireless manner, and the remote data center is used to analyze data for achieving the function of electricity larceny prevention. The electricity larceny prevention system is reasonable in design; the electronic transformers mounted on the power cables are used with the line monitoring terminal and the remote data center to achieve the function of electricity larceny prevention; transforming efficiency of the transformer can be detected fast to allow the aged and failed transformer to be replaced timely and avoid electricity waste, and energy conservation and emission reduction are achieved; the electricity larceny prevention system has the advantages of safety, reliability, high stability, convenience in use and the like.
Owner:STATE GRID CORP OF CHINA +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products