Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

220 results about "Recovery stage" patented technology

There are five Stages of Change that occur in the recovery process: Pre-Contemplation, Contemplation, Preparation, Action, and Maintenance.

Fast primary cluster recovery

A cluster recovery process is implemented across a set of distributed archives, where each individual archive is a storage cluster of preferably symmetric nodes. Each node of a cluster typically executes an instance of an application that provides object-based storage of fixed content data and associated metadata. According to the storage method, an association or “link” between a first cluster and a second cluster is first established to facilitate replication. The first cluster is sometimes referred to as a “primary” whereas the “second” cluster is sometimes referred to as a “replica.” Once the link is made, the first cluster's fixed content data and metadata are then replicated from the first cluster to the second cluster, preferably in a continuous manner. Upon a failure of the first cluster, however, a failover operation occurs, and clients of the first cluster are redirected to the second cluster. Upon repair or replacement of the first cluster (a “restore”), the repaired or replaced first cluster resumes authority for servicing the clients of the first cluster. This restore operation preferably occurs in two stages: a “fast recovery” stage that involves preferably “bulk” transfer of the first cluster metadata, following by a “fail back” stage that involves the transfer of the fixed content data. Upon receipt of the metadata from the second cluster, the repaired or replaced first cluster resumes authority for the clients irrespective of whether the fail back stage has completed or even begun.
Owner:HITACHI VANTARA LLC

Photovoltaic grid-connected inverter low voltage ride through (LVRT) control method

ActiveCN103066624AAchieving safe traversalAvoid the influence of overcurrent disconnectionEmergency protective circuit arrangementsSingle network parallel feeding arrangementsControl signalAverage current
The invention discloses a photovoltaic grid-connected inverter low voltage ride through (LVRT) control method, and relates to the field of grid-connected photovoltaic power generation. The method is characterized by comprising a distribution procedure of active power and reactive power in the LVRT process, and procedures about elimination of current peak and protection to an inverter. The procedure of protection to the inverter includes that when a grid is in a grid voltage drop stage or in a grid voltage recovery stage, if an average current value of any phase of three-phase current outputted by the inverter is detected to exceed an average threshold value, a pulse-width modulation (PWM) control signal of the inverter is switched off, and the PWM control signal of the inverter can be recovered after duration of half PWM control signal cycle time; and if an instantaneous value of any phase of the three-phase current of an output end of the inverter is detected to exceed an instantaneous threshold value, the connection between the inverter and the grid can be switched off. The instantaneous threshold value is higher than the average threshold value and the like.
Owner:四川科陆新能电气有限公司

Multi-agent based distribution network disaster responding recovery coordinate control method and multi-agent based distribution network disaster responding recovery coordinate control device

The invention provides a multi-agent based distribution network disaster responding recovery coordinate control method and a multi-agent based distribution network disaster responding recovery coordinate control device. The method comprises the steps of firstly determining an objective function and constraint conditions of distribution network disaster responding recovery, dividing a distribution network recovery stage into a backbone channel recovery stage, a local distribution network recovery stage and a region networking recovery stage, then setting the stages of distribution network recovery to be a backbone recovery Agent, a local distribution network recovery Agent and a region networking recovery Agent respectively, establishing a blackboard model based MAS coordination mechanism, establishing an MAS based distribution network recovery control decision making system, acquiring a recovery result, carrying out verification on the recovery result by adopting a verification Agent, acquiring a final recovery result, transmitting the final recovery result to a user interface Agent through a global recovery Agent, and putting an end to distribution network disaster responding recovery. Therefore, the reliability in power supply of an electric power system is improved, the power supply reliability of the electric power system under natural disaster conditions in particular is improved, and the investment income of a power grid is improved.
Owner:STATE GRID LIAONING ELECTRIC POWER CO LTD SHENYANG POWER +2

Fast primary cluster recovery

A cluster recovery process is implemented across a set of distributed archives, where each individual archive is a storage cluster of preferably symmetric nodes. Each node of a cluster typically executes an instance of an application that provides object-based storage of fixed content data and associated metadata. According to the storage method, an association or “link” between a first cluster and a second cluster is first established to facilitate replication. The first cluster is sometimes referred to as a “primary” whereas the “second” cluster is sometimes referred to as a “replica.” Once the link is made, the first cluster's fixed content data and metadata are then replicated from the first cluster to the second cluster, preferably in a continuous manner. Upon a failure of the first cluster, however, a failover operation occurs, and clients of the first cluster are redirected to the second cluster. Upon repair or replacement of the first cluster (a “restore”), the repaired or replaced first cluster resumes authority for servicing the clients of the first cluster. This restore operation preferably occurs in two stages: a “fast recovery” stage that involves preferably “bulk” transfer of the first cluster metadata, following by a “fail back” stage that involves the transfer of the fixed content data. Upon receipt of the metadata from the second cluster, the repaired or replaced first cluster resumes authority for the clients irrespective of whether the fail back stage has completed or even begun.
Owner:HITACHI VANTARA LLC

Frequency support control method used for doubly-fed wind generation set and based on two-stage power tracking optimization

The invention relates to a frequency support control method used for a doubly-fed wind generation set and based on two-stage power tracking optimization. The invention starts from optimization of frequency support dynamic characteristics of a wind generation set and provides a frequency support control method used for the wind generation set and based on two-stage variable proportion coefficient optimized power tracking. On the basis, a variable proportion coefficient control strategy in an inertial response stage is derived based on a virtual inertia time coefficient and a rotor movement equation, and for quick recovery of a maximum power tracking operation mode of the wind generation set after inertial support and avoiding secondary disturbance from being produced on system frequency adjustment in a recovery process, a variable proportion coefficient control strategy in a maximum power tracking operation mode recovery stage is designed by adopting fussy control. The frequency supportcontrol method provided by the invention has control robustness, a control structure is simple, engineering implementation is easy, and the quick recovery of the maximum power tracking operation modeof the doubly-fed wind generation set after inertial response and inertial support on a power grid frequency can be realized.
Owner:WUHAN UNIV

Method for rebuilding data of magnetic disk array

ActiveCN101436149AOptimal Reconstruction MethodReduce access intensityRedundant data error correctionHigh availabilityComputer data storage
The invention provides a data reconstruction method for disk array, which belongs to computer data storage methods and solves the problems that disk array data reconstruction consumes excessive time and affects the reading-writing performance and reliability of systems. The method consists of a reconstruction stage and a recovery stage in sequence, wherein an agent disk array is arranged outside a disk array during reconstruction; a user control interface, a reconstruction module, a space management module, a hot data identification module, a request redirection module, a data recovering module, a redirection data log table and a non-hot data chain list are arranged on the disk array during reconstruction; the reconstruction stage comprises a reconstruction step and a reconstruction-stage request processing step which are concurrent; and the recovery stage comprises a data recovering step and a recovery-stage request processing step which are concurrent. The method has the advantages of accelerating reconstruction speed and reducing the access response time of users, does not change reconstruction process or the data distribution mode of the disk array, and is suitable for constructing the storage systems with high performance, availability and reliability.
Owner:HUAZHONG UNIV OF SCI & TECH

Handling method of province-level power grid black-start and large-range power failure accidents

InactiveCN103036227ARealize online matchingDevelop systems scienceAc network circuit arrangementsElectricityPower grid
The invention discloses a handling method of province-level power grid black-start and large-area power failure accidents. The black-start of the power grid is divided into two stages, schemes of black-start of several subsystems are generated on conditions that black-start power sources and other constraint conditions are satisfied, and all of the schemes of black-start of the several subsystems are relatively independent and synchronous recovery is possible. When all of the subsystems are recovered, power is transmitted to surplus non-transmitted nodal points of designated girds, and power supply points are charged nodal points in the system at the moment, power-transmission paths are preferably calculated and are not necessarily black-start assembling units. The handling method of the province-level power grid black-start and large-range power failure accidents takes quick recovery optimization algorithms of large-area power failure accidents as the core, provides black-start optimization schemes by utilizing black-start optimization algorithms, divides the province-level power grid black-start into a stage of subsystem independent recovery and a stage of interconnection and corporation recovery to ensures that establishment of black-start schemes is more systemic and scientific.
Owner:CHINA THREE GORGES UNIV +2

Method for iron concentrate in ore grinding, coarse and fine separation, gravity-magnetic-flotation process tailings in recovery stage

The invention relates to the technical field of re-election of lean hematite tailings, in particular to a method for iron concentrate in tailings in the recovery stage of grinding, coarse and fine separation, and gravity-magnetic-flotation process, which is characterized in that the lean hematite stage The comprehensive tailings in the combined process of ore grinding, coarse and fine classification, gravity separation-magnetic separation-flotation are obtained by gravity separation and weak magnetic sweeping. Roughing, beneficiation and three-stage scavenging of weak magnetic and strong magnetic-reverse flotation operations to recover magnetic ore in tailings. In the present invention, the comprehensive tailings are sorted by gravity separation and weak magnetic sweeping, and the rough concentrate with a grade of 27% to 31% is recovered, which reduces the processing capacity of subsequent grinding and sorting operations and improves the selection of subsequent operations Grade; regrind the coarse concentrate to dissociate the intergrowth in the coarse concentrate; use weak magnetic, strong magnetic-reverse flotation to sort the regrind coarse concentrate, and obtain the final grade of more than 66%. Concentrate, to reduce the comprehensive tailings grade by 1%, to achieve the effective use of resources.
Owner:ANSTEEL GRP MINING CO LTD

Fertilizer and water integrated high-yield cultivation method for early-spring watermelons and autumn delayed chilies in greenhouse

The invention discloses a fertilizer and water integrated high-yield cultivation method for early-spring watermelons and autumn delayed chilies in a greenhouse. The cultivation method specifically comprises the steps of preparation of seedling beds for watermelons and chilies, seed soaking and germination acceleration, sowing, land preparation and bed making, field transplanting, a seeding recovery stage, a flowering and fruit bearing stage, a maturation stage and a harvesting stage. According to the fertilizer and water integrated high-yield cultivation method for early-spring watermelons and autumn delayed chilies in the greenhouse, the temperature, the humidity and the fertilizer and water amount are strictly controlled according to the growth features of watermelons and chilies, watermelons and chilies grow vigorously, the mu yield of watermelons ranges from 3500 kg to 4000 kg, the mu yield of chilies ranges from 2900 kg to 3100 kg, and watermelons and chilies are uniform in size, bright in color, pure in taste and rich in nutrition; chilies are planted after watermelons are harvested, and alternation planting is achieved; watermelon vines are smashed and then scattered into soil, soil fertility is ensured, and pathogen microorganisms are suppressed; a fertilizer and water integrated pipe network conforms to the planting density of watermelons and chilies and only needs to be arranged one time, materials are saved, the utilization rate is increased, the production cost is reduced, and the economic income is increased.
Owner:丁广礼

Multimodal flight conversion control method for hybrid layout rotary-wing unmanned aerial vehicle

InactiveCN105235892AGive full play to multi-mode flight capabilitiesGet the most out of multitaskingAircraft navigation controlRotocraftLow speedFlight vehicle
The invention discloses a multimodal flight conversion control method for a hybrid layout rotary-wing unmanned aerial vehicle, and relates to the technical field of flight control for unmanned aerial vehicles. Based on composite multimodal multipurpose aircrafts, the hybrid layout rotary-wing unmanned aerial vehicle comprises five types of flight modal; and aiming at a take-off/air-drop stage, a task arriving stage, a task executing stage, a task evacuating stage and a landing/recovery stage respectively, the multimodal flight conversion control method provides seven modal conversion modes and conversion opportunities. According to the multimodal flight conversion control method provided by the invention, the hybrid layout rotary-wing unmanned aerial vehicle can be reasonably converted among various modal types to meet different task requirements, and the multimodal flight capability and the multitask capability of the hybrid layout rotary-wing unmanned aerial vehicle can be sufficiently exerted; and the general land take-off and landing capability of the hybrid layout rotary-wing unmanned aerial vehicle can be sufficiently exerted, the flexible water-surface/carrier-borne/vehicle-mounted/airborne drop and other deployment modes of the hybrid layout rotary-wing unmanned aerial vehicle can be utilized, and the high-speed cruise capability and the low-altitude and low-speed capability of the hybrid layout rotary-wing unmanned aerial vehicle can be sufficiently exerted, so as to achieve the rapid arriving and evacuating as well as low-speed and low-altitude task executing capabilities of the hybrid layout rotary-wing unmanned aerial vehicle.
Owner:BEIHANG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products