Unlock instant, AI-driven research and patent intelligence for your innovation.

Resource scheduling method, device and equipment based on departure scheduling and medium

A resource scheduling and resource technology, applied in the field of traffic control, can solve the problem of low resource scheduling efficiency, achieve the effect of solving low efficiency, improving efficiency, and reducing development costs

Pending Publication Date: 2022-07-05
四川万网鑫成信息科技有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The embodiment of the present application provides a resource scheduling method, device, equipment and medium based on departure scheduling, which solves the existing technical problem of low efficiency of temporary resource scheduling for departure scheduling in a small area

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource scheduling method, device and equipment based on departure scheduling and medium
  • Resource scheduling method, device and equipment based on departure scheduling and medium
  • Resource scheduling method, device and equipment based on departure scheduling and medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] It should be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application.

[0036] The main solution of the embodiment of the present application is: by receiving a resource change request, the resource change request includes the resource change information in the target shift plan; based on the resource change information, it is judged whether the trigger condition is met; if the Trigger conditions, then schedule scheduling according to preset scheduling rules.

[0037] Departure scheduling is the basis for ensuring the orderly and efficient operation of line vehicles. For example, public transportation such as motor trains and buses need to be scheduled. The existing temporary scheduling for small-scale areas (such as parks) and subsequent resource changes all rely on manual on-site departure scheduling, which is inefficient. reasonableness is affected.

[0038] To this end, th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention discloses a resource scheduling method and device based on departure scheduling, equipment and a medium, and the method comprises the steps: receiving a resource change request which comprises resource change information in a target scheduling plan; judging whether a triggering condition is met or not based on the resource change information; and if the triggering condition is met, scheduling according to a preset scheduling rule. Namely, the method provides an automatic resource scheduling method based on departure scheduling when dynamic temporary changes occur in the resources in the vehicle scheduling plan in the small-range area, and compared with the existing temporary scheduling by manual work, the method has the advantages that the temporary resource scheduling efficiency of departure scheduling in the small-range area is remarkably improved, and the scheduling efficiency of the resources in the vehicle scheduling plan in the small-range area is greatly improved. The technical problem of low temporary resource scheduling efficiency is solved. In addition, program development is carried out for departure scheduling in a small-range area, and can be realized through scripts, so that light weight is realized, and the development cost is reduced.

Description

technical field [0001] The present application relates to the technical field of traffic control, and in particular, to a resource scheduling method, device, device and medium based on departure scheduling. Background technique [0002] Departure scheduling is the basis for ensuring the orderly and efficient operation of line vehicles. For example, public transportation such as motor trains and buses need to be scheduled. The existing departure scheduling for small-scale areas (such as parks) relies on manual on-site departure scheduling, and temporary scheduling caused by dynamic changes of resources also needs to be performed manually, resulting in low efficiency of temporary resource scheduling for departure scheduling. [0003] It should be noted that the information disclosed in the above Background section is only for enhancing understanding of the background of the application, and therefore may include information that does not form the prior art known to a person of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/06312G06Q10/063114
Inventor 王明君刘明顺陈鑫伟吴海燕
Owner 四川万网鑫成信息科技有限公司