Combined cofferdam construction method
A technology combining cofferdams and construction methods, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as uneconomical and difficult construction of bridge foundations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0024] Such as figure 1 ,figure 2, image 3 As shown, the invention provides a kind of combined cofferdam construction method, comprises the following steps:
[0025] A. On the upstream side of the embankment 10, the drilled occlusal piles are constructed according to the design position to form the pile foundation part 1 of the underground diaphragm wall. Pile a is constructed first, and pile b is constructed later. The concrete of pile a is super-retarded concrete, and it is required to complete pile b before the initial setting of the concrete of pile a. Among them, pile a is a plain concrete pile, and pile b is a reinforced concrete pile. The drilled piles at both ends of the drilled occlusal pile are B piles, and the pre-embedded steel plates 7 are installed together with the reinforcement cages of the B piles at both ends of the underground diaphragm wall. Th...