Concrete basement structure with/without bonding prestress and its construction method

A prestressed, basement technology, used in underwater structures, infrastructure engineering, buildings, etc., can solve problems such as basement soaking in water, unsolvable basement leakage, and basement leakage, achieving strong durability and avoiding problems. Hidden water leakage and good seismic performance

Inactive Publication Date: 2009-07-22
刘志刚
View PDF0 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the basements constructed by the above method, many basements have leakage problems, and the leakage problems of some basements cannot be solved, causing the basements to be soaked in water for a long time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Concrete basement structure with/without bonding prestress and its construction method
  • Concrete basement structure with/without bonding prestress and its construction method
  • Concrete basement structure with/without bonding prestress and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but not as a limitation of the present invention.

[0038] A method for constructing a prestressed concrete basement with or without bonding, the operation is as follows:

[0039] a) Closely combine the pile body with the plain concrete cushion, and disengage the pile body from the basement floor; use the pile foundation when the bearing capacity of the foundation cannot be satisfied, at this time, the pile foundation and the cushion layer are closely combined, But the pile body and the bottom plate are disengaged;

[0040] b) A sliding layer of a plastic plate is set between the plain concrete cushion and the basement floor, and the plastic plate is preferably a material with a small friction coefficient;

[0041] c) Stretch the steel strands in two directions horizontal to the basement floor and apply prestress;

[0042] d) Do a good job of w...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a bonded-unbonded pre-stress concrete basement structure and a corresponding construction method thereof. The construction method includes the floor-slab construction involving the steps of: separating a pile body from a soleplate, arranging a plastic plate sliding layer, applying the pre-stress; and carrying out waterproof treatment and integrating the pile body with the soleplate. The outer wall construction involving the steps of: arranging a sliding layer between the outer wall and the soleplate or the floor-slab; applying the pre-stress; carrying out the anti-corrosion treatment to the anchoring tools; carrying out the pressure grouting for the pre-embedded pipes with the bonded pre-stress and grouting the big or small pedestal foot of the outer wall of the basement after the pre-stress is applied to the outer wall of the basement. The basement structure is constructed according to the construction method and has the advantages that the load-carrying capability is better; the leakage can be avoided; the durability is strong and the earthquake resistance is good; in addition, the basement structure eliminates the temperature expansion joints, post-cast strips and expansion reinforced strips, completely avoids the leakage risk caused by the rubber waterproof strip and the like and the trouble caused by the management and maintenance, thus overcoming the various defects of the existing basement.

Description

technical field [0001] The invention belongs to the field of construction engineering, and in particular relates to a basement structure of prestressed concrete with or without bonding and a construction method thereof. Background technique [0002] With the rapid development of my country's economy, more and more building basements and underground parking lots are being built. According to my country's current engineering structure design method, many problems have been exposed in use. For example, according to my country's current "Code for Design of Concrete Structures" GB50010-2002, it is required to set up an expansion joint every 30-55m for different structures under indoor or soil conditions. For a building with a large plane size, it must be divided into many blocks, these blocks are completely separated, and the middle is connected with a rubber waterstop for waterproofing, such as Figure 1b As shown in the traditional basement expansion joint method, the temperat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D29/045
Inventor 刘志刚史迪夫·克鲁斯
Owner 刘志刚
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products