System for quickly plugging burst part during dike bursting
A fast and plugging technology, applied in the fields of water conservancy construction, river management, and flood control, it can solve the problems of large loss of people's lives and property, large inundation area, and long time consumption.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be further described below in combination with specific embodiments.
[0043] Implement Column 1.
[0044] In this embodiment, the width of the crevasse is 20 meters, and the length of a steel beam is 25 meters, and a steel beam can span both ends of the crevasse (such as Figure 5 ).
[0045] This embodiment implements the purpose through the following steps.
[0046] Step 1: Construction preparations, rush to build the bund head, make preparations for the sealing materials, personnel, and location, and at the same time, rush to build the bund head to prevent the entrance from continuing to expand.
[0047] Step 2: Piling, if there is land directly opposite the breach (such as the opposite bank of a river), piling should be done on land, and if there is no land, piling should be driven in a zone with better soil quality in the water.
[0048] Step 3: Pull the rope and fix one end of the main rope on the pile. Then, the dish-shaped engineer...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com