Complete Composite Beam of Steel Tube Concrete and Its Manufacturing Technology
A steel pipe concrete, fully combined technology, applied in the field of composite beams, can solve problems affecting the pressure bearing performance of composite structures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Concrete filled steel tube fully composite beams, such as figure 1 As shown, it includes a steel pipe 1, concrete 2 in the steel pipe 1, a steel web and a bottom plate 4. The steel web is a corrugated steel web 3, and the corrugated steel web 3 is arranged between the steel pipe 1 and the bottom plate 4. The steel pipe 1 is provided with a head plate at the end, and the corrugated steel web 3 and the steel pipe 1 are welded by an arc-shaped weld. Since the surface of the steel pipe 1 is arc-shaped, the connecting edge of the corrugated steel web 3 is corrugated. Therefore, when the corrugated steel web 3 is welded to the steel pipe 1, the welded seam is arc-shaped, and the arc-shaped welding increases The length of the weld seam is conducive to the horizontal and vertical shrinkage of the steel pipe 1, so as to further hold the pre-pressed concrete 2 tightly, so as to achieve the close contact between the steel pipe and the concrete, so that the components can reach a f...
Embodiment 2
[0035] Concrete filled steel tube fully composite beams, such as figure 2 As shown, the difference between this embodiment and embodiment 1 is that there are two steel pipes 1 . The use of two side-by-side steel pipes 1 improves the shear performance of the composite structure for the complete composite beam structure of steel pipe concrete. Base plate 4 is the combination of steel plate and steel cable.
[0036] The manufacturing process of fully composite steel tube concrete beams includes the following processes: welded steel tube head plate, vibratory pouring of concrete 2 inside the steel tube 1, placing the other end of the head plate and applying pressure, welding the head plate, concrete under pressure solidification, corrugated steel web 3 Welding with the steel pipe 1 and the bottom plate.
[0037] Before the initial setting or after the final setting of the concrete under pressure solidification, the inside of the steel pipe 1 is grouted through a pressurized gro...
PUM