Forced water circulation high-capacity hot water boiler of circulating fluidized bed
A technology of circulating fluidized bed and hot water boiler, which is applied to fluidized bed combustion equipment, water heater, fluid heater, etc., can solve the problems of unsafe water circulation system, excessive resistance of water system, complicated water circulation system, etc. Achieve the effect of preventing the blockage of the returned material from causing shutdown, stable long-term operation, and reducing the failure rate of the returned material
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0012] Specific implementation mode one: combine Figure 1 to Figure 5 Describe this embodiment, this embodiment includes water supply distribution header 1, lower economizer 2, middle economizer 3, upper economizer 4, economizer upper header 5, economizer coating pipe 6, collection Water bag 7, downpipe 8, water wall lower header 9, furnace water wall 10, water wall upper header 11, outlet pipe 12, drum 13, connecting pipe 14, water cooling jacket water inlet pipe 15, separator water cooling jacket 16 , water cooling jacket outlet pipe 17, power failure water supply pipe 18, one water outlet end of the water distribution header 1 is connected to the lower economizer 2, the lower economizer 2 is connected to the middle economizer 3, and the middle economizer 3 is connected to the upper economizer The economizer 4 is connected, the water outlet end of the upper economizer 4 is connected with the economizer upper header 5, and the economizer upper header 5 is connected with the ...
specific Embodiment approach 2
[0018] Specific implementation mode two: combination figure 1 To illustrate this embodiment, valves are installed on the downcomer 8 , the water inlet pipe 15 of the water cooling jacket, the outlet pipe 17 of the water cooling jacket and the power failure water supply pipe 18 of this embodiment. The power failure protection function is realized by closing and opening the valve. Other components and connections are the same as those in the first embodiment.
specific Embodiment approach 3
[0019] Specific implementation mode three: combination figure 1 This embodiment will be described. The lower economizer 2 , the middle economizer 3 and the upper economizer 4 in this embodiment have variable cross-section structures. After the cross-section is changed, the functions of equal smoke velocity and no ash accumulation are realized, which avoids the problems of increased resistance and increased exhaust gas temperature caused by the ash accumulation of the economizer, and completely solves the problems of ash accumulation, wear and corrosion of the economizer tube. Other compositions and connections are the same as those in Embodiment 1 or Embodiment 2.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com