Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method and control system for train approach blocking control based on ATS system

A control method and control system technology, applied in the field of train route blockade control method and control system based on ATS system, can solve problems such as inaccurate blockade, high cost of job rotation training, complex route processing procedures, etc., and achieve accurate selection , Simple operation, solve the effect of complicated procedures

Active Publication Date: 2016-03-09
浙江众合科技股份有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide an ATS system-based train route blocking control method and control system, which can solve the problems of complex route processing procedures, high cost of job rotation training and inaccurate blockade in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and control system for train approach blocking control based on ATS system
  • A method and control system for train approach blocking control based on ATS system
  • A method and control system for train approach blocking control based on ATS system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] In order to make the above objects, features and advantages of the present invention more comprehensible, specific implementations of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0028] In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. However, the present invention can be implemented in many other ways different from those described here, and those skilled in the art can make similar extensions without violating the connotation of the present invention, so the present invention is not limited by the specific implementations disclosed below.

[0029] figure 1 A structural block diagram of the ATS system-based train access blocking control system according to an embodiment of the present invention is shown, including:

[0030] The operation display module 1 is used to input user request information and output it to the ro...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an automatic train supervision (ATS) system based train route block control method and system. The method includes steps that a first route information listing in a track data base is retrieved according to user requesting information input by a user, a second route information listing is determined through a key information comparison manner, the user inputs user selection information according to the second route information listing to obtain a third route information listing, and the third route information listing checks whether a route is blocked through a block checking module to determine route block state information. By means of the ATS system based train route block control method and system, existing problems of complicated processing programs, high work shift training costs and inaccurate block of routes in the prior art can be solved.

Description

technical field [0001] The invention relates to the field of urban rail transit signal processing, in particular to an ATS system-based train approach blocking control method and control system. Background technique [0002] The ATS (Automatic Train Supervision, automatic train monitoring) subsystem is a key subsystem of the urban rail transit signal system. It provides signal control and train management functions for the traffic dispatcher and station attendant in the train control center, and the train access block control is one of them. an important component. [0003] In the prior art, the train route blockade control relies on the interlocking system to realize signal blockage or section blockade. Specifically, when applying for route blockade manually or automatically, the interlock system searches for signals related to the route blockage that needs to be realized. Then check whether the signal machine and section are blocked. If not blocked, block the signal machi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B61L27/02
Inventor 李祥兵孙莹莹展定娜
Owner 浙江众合科技股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products