B/S and C/S architectural pattern based information monitoring and measuring method for tunnels and underground constructions
A technology for underground engineering and tunnels, applied in the direction of computer control, general control system, control/regulation system, etc., can solve the problems of construction safety hazards, low work efficiency, mere formality, etc., to improve work efficiency and facilitate the whole process The effect of monitoring
Image
Examples
Embodiment Construction
[0012] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0013] Such as figure 1 As shown, the tunnel and underground engineering information monitoring and measurement method based on B / S and C / S architecture mode includes mobile smart terminal data collection method, server-side data processing method, mobile smart terminal data query and early warning information receiving method and PC The computer client data processing method; the tunnel and underground engineering information refers to the displacement data of the vault sinking, the surrounding convergence, and the stress and strain monitoring measurement data.
[0014] The mobile intelligent terminal data collection method: firstly carry out unique coding step by step according to the level of project information "project name-tender section-single project (or work area) name-special project name-section-measuring point", select during data collection...
PUM
Login to View More Abstract
Description
Claims
Application Information
- IPC
- G05B15/02
- Inventors
- 詹显军; 尚海松

